PLM03-03402
| Sprinkler (Final) | 10/29/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | A | PASS |
|
|
###-#### tim sp final ok 10/29/2003 2:47:48 PM
|
PLM03-03403
| Water and/or Sewer | 10/29/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | A | PASS |
|
|
swr line only-- eddie ###-#### sewer final ok 10/29/2003 2:31:05 PM
|
PLM03-03340
| Water and/or Sewer | 10/29/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | A | FAIL |
|
|
pipe under stress 10/30/2003 9:57:14 AM
|
PLM03-03407
| Final | 10/29/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | A | PASS |
|
|
frank-- ###-#### final ok 10/30/2003 8:56:18 AM
|
PLM03-03190
| Final | 10/29/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | A | NR |
|
|
###-#### Frank
|
PLM03-02435
| Final | 10/30/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | A | PASS |
|
|
final ok
|
PLM03-00533
| Other | 10/30/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | A | FAIL |
|
|
stopped by and left a card saying the plumber called to say he wanted to final the permit as a rough in only because someone esle set the fixtures, and to have whoever set the fixtures to get a permit and call for inspection.
|
PLM03-03398
| Sprinkler (Final) | 10/29/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | P | PASS |
|
|
jose-- ###-#### sp final ok 10/30/2003 1:55:53 PM
|
PLM03-03399
| Sprinkler (Final) | 10/29/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | P | PASS |
|
|
jose ###-#### sp final ok 10/30/2003 1:56:09 PM
|
PLM03-03340
| Water and/or Sewer | 10/30/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | P | PART |
|
|
pressure sewer and 2" water to shop ok to cover 10/30/2003 1:31:07 PM
|
PLM03-03415
| Sprinkler (Final) | 10/30/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | P | PASS |
|
|
###-#### Chad sp final ok 10/30/2003 1:43:08 PM
|
PLM03-00184
| Final | 10/30/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | P | NR |
|
|
###-#### Grag test rp by furnace 10/30/2003 2:45:14 PM
|