BLD03-01510
| BLD-Grading Inspection | 10/30/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | | PASS |
|
|
Final grading and drainage approved.
|
BLD03-02023
| BLD-Grading Inspection | 10/30/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | | PASS |
|
|
Basement footing subgrade has been approved by the geotechnical engineer
|
BLD02-01518
| BLD-Grading Inspection | 10/30/2003 | 10/30/2003 | 10/30/2003 12:00:00 AM | | PASS |
|
|
Final grading and drainage approved
|