FIR06-00007
| FIR-Aging Inspection | 10/30/2006 | 10/30/2006 | 10/31/2006 12:05:57 PM | | DEFR |
|
|
|
FIR06-00006
| FIR-Aging Inspection | 10/30/2006 | 10/30/2006 | 10/31/2006 12:05:42 PM | | DEFR |
|
|
|
FIR06-00677
| INSP-Sprinkler Rough-in | 10/27/2006 | 10/30/2006 | 10/31/2006 9:17:08 AM | P | PART |
|
|
OH rough-in for cover is okay except as noted on approved plans, one ssu is missing abve the restroom, one head at a new entryway is not yet installed, annular space between the new wall and existing freezer wall may not be properly covered.
|
FIR06-00797
| INSP-Final Inspection | 10/30/2006 | 10/30/2006 | 10/31/2006 9:14:28 AM | P | PART |
|
|
Fire alarm tested satisfactory, need to replace the damaged riser mounted flow switch as the housing base is cracked and the flex conduit and switch cover cannot be secured.
|
BLD06-02060
| FIRE-Final Inspection | 10/30/2006 | 10/30/2006 | 10/30/2006 3:20:11 PM | P | NR |
|
|
Pending alarm and sprinkler permit finals prior to life safety final, confrence room 705 is not yet complete, need to mount fire extinguishers as discussed.
|
FIR06-00679
| INSP-Final Inspection | 10/30/2006 | 10/30/2006 | 10/30/2006 3:18:46 PM | P | PART |
|
|
Need to relocate one head in the break room as discussed.
|
FIR06-00666
| INSP-Final Inspection | 10/30/2006 | 10/30/2006 | 10/30/2006 3:18:01 PM | P | PART |
|
|
Fire alarm work is acceptable pending completion of confrence room 705 and the associated notification device which is not installed at this time.
|
FIR06-00788
| INSP-Final Inspection | 10/26/2006 | 10/30/2006 | 10/30/2006 1:46:15 PM | A | PASS |
|
|
Required corrections have been verified for completion. The hood suppression system functioned properly under test conditions, inspection passed.
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 10/27/2006 | 10/30/2006 | 10/30/2006 12:57:27 PM | A | PART |
|
|
Second floor NW quad OH hydrostatic test passed. Rough-in is good for cover at the drop ceiling areas, noted one ssu in the electrical room which needs to be relocated as discussed.
|
FIR06-00639
| INSP-Sprinkler Rough-in/Hydro | 10/27/2006 | 10/30/2006 | 10/30/2006 11:54:24 AM | A | PART |
|
|
OH hydrostatic test for the 4th floor passed, items noted on previous c/n for the 4th floor have been completed.
|