FIR08-00618
| INSP-Final Inspection | 10/30/2008 | 10/30/2008 | 10/30/2008 4:42:58 PM | P | NR |
|
|
Noted trouble at the panel due to nac fault, three sprinkler tampers closed due to work in progress,system is not ready for final inspection at this time.
|
FIR08-00596
| INSP-Sprinkler Rough-in/Hydro | 10/30/2008 | 10/30/2008 | 10/30/2008 4:40:09 PM | P | PART |
|
|
Sprinkler installation at the 2nd floor hard lid ceiling above the stairway is approved for cover, minor adjustments made while on site, see plans for locations okayed wtih todays date.
|
FIR08-00595
| INSP-Sprinkler Rough-in | 10/29/2008 | 10/30/2008 | 10/30/2008 4:36:45 PM | P | NR |
|
|
|
BLD07-03215
| FIRE-Final Inspection | 10/30/2008 | 10/30/2008 | 10/30/2008 3:10:10 PM | P | PASS |
|
|
C/N finished, final fire life safety inspection passed.
|
FIR06-00621
| INSP-Alarm Testing | 10/27/2008 | 10/30/2008 | 10/30/2008 2:39:37 PM | A | PART |
|
|
Fire alarm notification devices tested okay at the 2nd floor mechanical room areas, common corridor, restrooms, locker room and mech. penthouse, EOL voltage is satisfactory,
|
BLD08-02224
| FIRE-Final Inspection | 10/29/2008 | 10/30/2008 | 10/30/2008 1:47:43 PM | P | FAIL |
|
|
Some items on the previous correction notice are not yet finished including exit signs and EM lights still in need of repair at various locations, also missing panic hardware at the northeast pair of exit doors to the pool enclosure, noted three fire extinguishers not yet installed. Inspection to be rescheduled as discussed when work is completed.
|
BLD08-00985
| FIRE-Final Inspection | 10/30/2008 | 10/30/2008 | 10/30/2008 12:58:04 PM | P | FAIL |
|
|
Need to provide verification the two access control egress doors are interconnected to the fire alarm control panel for power loss to the magnets upon alarm condition-see electrical sheet note 22 red lined annotation and fire code review notes for details. Also need to provide one missing exit sign at the east side per approved drawings.
|
FIR08-00521
| FIR-Aging Inspection | 10/30/2008 | 10/30/2008 | 10/30/2008 12:53:29 PM | | DONE |
|
|
Site visit confirmed building construction underway, work in progress.
|
FIR08-00514
| INSP-Supply line flush | 10/29/2008 | 10/30/2008 | 10/30/2008 10:56:33 AM | A | PART |
|
|
UG fire supply line flush completed satisfactory.
|
FIR08-00727
| INSP-Final Inspection | 10/29/2008 | 10/30/2008 | 10/30/2008 10:03:10 AM | A | PASS |
|
|
Fire sprinkler permit work passed final inspection.
|
FIR08-00239
| INSP-Sprinkler Rough-in/Hydro | 10/29/2008 | 10/30/2008 | 10/30/2008 9:31:03 AM | A | FAIL |
|
|
Insulation at the concealed non-sprinklered attic pockets is still missing, will need inspection prior to cover approval.
|
FIR08-00449
| FIR-Aging Inspection | 10/30/2008 | 10/30/2008 | 10/30/2008 9:17:26 AM | | DONE |
|
|
Work in progress, site construction underway.
|
BLD08-01853
| FIRE-Final Inspection | 10/29/2008 | 10/30/2008 | 10/30/2008 9:16:41 AM | A | PASS |
|
|
Corrections verified for completion, fire life safety final inspection passed.
|