BLD08-02147
| BLD-Footing | 10/30/2008 | 10/30/2008 | 10/30/2008 5:11:25 PM | P | PART |
|
|
p.j. Phone #: ###-#### still wip
|
ESC08-00851
| Site Preparation | 10/30/2008 | 10/30/2008 | 10/30/2008 5:09:06 PM | P | PART |
|
|
ok so far,, wip
|
ESC08-00961
| Site Preparation | 10/30/2008 | 10/30/2008 | 10/30/2008 3:29:10 PM | P | PART |
|
|
working on b m p's,, will wash out in wheel barrow then on rear lot area
|
ESC08-00709
| Site Final | 10/30/2008 | 10/30/2008 | 10/30/2008 3:13:39 PM | P | PASS |
|
|
|
BLD08-02059
| BLD-Framing/Rough-in | 10/30/2008 | 10/30/2008 | 10/30/2008 2:58:04 PM | P | PART |
|
|
todd Phone #: ###-#### Note:please call 1/2 hr prior to inspection will need mech vent looked at,, point loads in basement,, kitchen and bathroom ok to insulate
|
BLD08-01813
| BLD-Final | 10/30/2008 | 10/30/2008 | 10/30/2008 1:58:26 PM | P | PASS |
|
|
|
BLD08-01813
| DOC - Permit Finaled | 10/30/2008 | 10/30/2008 | 10/30/2008 1:46:19 PM | P | PASS |
|
|
|
BLD08-00488
| BLD-Final | 10/29/2008 | 10/30/2008 | 10/30/2008 1:43:36 PM | P | PART |
|
|
DAVE Phone #: ###-#### on site conf,, need smoke det. handrails percode
|
BLD08-02147
| BLD-Foundation | 10/29/2008 | 10/30/2008 | 10/30/2008 1:22:56 PM | A | NR |
|
|
p.j. Phone #: ###-####
|
BLD08-02147
| BLD-Footing | 10/29/2008 | 10/30/2008 | 10/30/2008 1:22:01 PM | A | PART |
|
|
p.j. Phone #: ###-#### wip on ftgs,, need to have S. I. and engineer approval prior to pouring
|
BLD08-02272
| BLD-Footing | 10/29/2008 | 10/30/2008 | 10/30/2008 11:53:00 AM | A | PASS |
|
|
gordon Phone #: ###-####
|
BLD08-01813
| BLD-Final | 10/29/2008 | 10/30/2008 | 10/30/2008 10:55:20 AM | A | PASS |
|
|
kevin Phone #: ###-####
|