Inspections for the day of: Thursday, October 30, 2008.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00716 BMP Violation10/30/200810/30/200810/30/2008 5:04:09 PMPFAIL
Spoke with RP and told him prior to getting a site final he would need to stabilize all the disturbed area of the demo project and if it is not complete by Friday in the PM, he would need to install a sediment barrier along the east side of the lot. Will re-inspect in on 11/3/08 AM
ESC08-00934 Site Preparation10/30/200810/30/200810/30/2008 4:21:28 PM NR
ESC08-00932 Site Preparation10/30/200810/30/200810/30/2008 3:21:15 PM PASS
ESC08-00510 General Inspection10/30/200810/30/200810/30/2008 2:25:41 PM DONE
ESC08-00510 Site Final10/30/200810/30/200810/30/2008 2:25:31 PMPPASS
ESC05-02061 Site Final10/30/200810/30/200810/30/2008 2:16:40 PMPPASS
ESC07-00166 Site Final10/30/200810/30/200810/30/2008 2:15:27 PMPPASS
ESC04-01586 Site Final10/30/200810/30/200810/30/2008 2:15:17 PMPPASS
ESC04-01586 Site Final10/30/200810/30/200810/30/2008 2:15:08 PMPPASS
ESC06-00870 Site Final10/30/200810/30/200810/30/2008 2:13:47 PMPPASS
ESC08-00412 Conference10/30/200810/30/200810/30/2008 2:04:14 PMPDONE
Went over with the RP when I can finalize her permit with erosion and sediment control. Told her that it will not hold up her CofO though. But she will be required to still stabilize.
ESC08-00178 General Inspection10/30/200810/30/200810/30/2008 12:08:42 PMAFAIL
Spoke with the RP. He is know on another project.
Correction Notice:
1. Provide a concrete washout pit or external sealed container or a narritive plan on how concrete washout will occur.
2.Clean out gutter pan of all sediment, debris, storage of Mortor mix, and all concrete and mortor washout residual.
3.Clean up and remove or place into a concrete washout area of all crete washout spoil piles.
4. Provide an RP that will have day to day control over the erosion and sediment control for the duration o the project.

Failure to comply will result in a Stop Work Order. Will re-inspect on 10/31/08 PM
ESC08-00656 General Inspection10/30/200810/30/200810/30/2008 11:44:06 AMAFAIL
Left a message with the applicate Mike from Capital Mobile Homes.
Correction Notice:
1. Need to provide an RP with in 24 hr period.
Will re-inspect on 10/31/08 PM. Failure to comply will result in a stop work order.
ESC08-00858 Complaint Inspection10/30/200810/30/200810/30/2008 11:12:58 AMAFAIL
Left a message with RP.

Correction Notice:
1.Provide a trash debris container.
2. Remove all solid waste from the project area or place into a solid waste container.
3.Re-install sediment bmp's at front of project area where the slope is greater than 2% and where the disturbed soil is.
4. Clean up all hard surfaces of all sediment and debris.
ESC08-00845 Site Preparation10/30/200810/30/200810/30/2008 10:43:18 AM PASS
Minor work has begun. Nothing exterior, all interior at this time. ESC sign posted.
ESC08-00618 General Inspection10/28/200810/30/200810/30/2008 10:07:12 AMAPASS
All debris was being removed or placed into a contained trailer.
ESC08-00365 BMP Violation10/28/200810/30/200810/30/2008 9:28:15 AMACANC
wrong date