Inspections for the day of: Friday, October 30, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01750 FIRE-Final Inspection10/30/200910/30/200910/30/2009 4:12:09 PMPPASS
Fire life safety is acceptable. Signature card not available on site at the time of inspection.
BLD09-01851 FIRE-Final Inspection10/29/200910/30/200910/30/2009 4:10:47 PMPPASS
Fire life safety is satisfactory pending removal of the manual thumbturn at the back exit door- to be done prior to structural final inspection as agreed.
BLD09-01879 FIRE-Final Inspection10/30/200910/30/200910/30/2009 4:09:20 PMPFAIL
Fire alarm system modifications done due to the remodel work will need submitted for an FIR permit and inspected prior to building fire life safety finals.
BLD09-01909 FIRE-Final Inspection10/30/200910/30/200910/30/2009 4:07:34 PMPFAIL
Noted several items including non-functional exit signs/EM lights, door hardware at several locations is not of the approved type, fire sprinkler system is overdue annual certification, etc. Discussed issues with the managers on site.
FIR09-00561 INSP-Final Inspection10/29/200910/30/200910/30/2009 4:04:55 PMAPASS
Final walkthrough of permit work passed, fire sprinkler finaled.
FIR09-00544 INSP-Final Inspection10/29/200910/30/200910/30/2009 4:03:26 PMAPASS
Both rough-in and final inspections completed in conjunction, permit finaled.
FIR09-00405 INSP-Final Inspection10/28/200910/30/200910/30/2009 4:02:39 PMAPASS
Fire alarm work passed site testing, permit okayed for final status.
FIR09-00605 INSP-Final Inspection10/29/200910/30/200910/30/2009 4:01:10 PMAPASS
Final fire sprinkler permit work inspection passed.
FIR09-00384 INSP-Sprinkler Rough-in10/29/200910/30/200910/30/2009 3:59:57 PMAPART
See stamped plan set for areas of the attic system piping inspected and okayed -marked with today's date.