BLD13-01459
| BLD-Ceiling Grid Inspection | 10/29/2013 | 10/30/2013 | 10/30/2013 4:10:22 PM | A | PASS |
|
|
rob Phone #: ###-####
|
BLD13-01805
| BLD-Energy code compliance | 10/30/2013 | 10/30/2013 | 10/30/2013 4:09:10 PM | P | PASS |
|
|
Kelly Phone #: ###-####
|
BLD13-01798
| BLD-Footing | 10/29/2013 | 10/30/2013 | 10/30/2013 3:14:46 PM | P | PART |
|
|
ready at 2 // Anton Phone #: ###-#### set backs ok
|
BLD13-01510
| BLD-Final | 10/30/2013 | 10/30/2013 | 10/30/2013 3:07:45 PM | P | PASS |
|
|
Rollo Phone #: ###-####
|
BLD13-01510
| DOC - Permit Finaled | 10/30/2013 | 10/30/2013 | 10/30/2013 3:07:33 PM | P | PASS |
|
|
|
BLD13-01510
| BLD-Blower Door Test Results | 10/30/2013 | 10/30/2013 | 10/30/2013 3:07:22 PM | P | PASS |
|
|
3.8
|
BLD13-02038
| BLD-Framing/Rough-in | 10/30/2013 | 10/30/2013 | 10/30/2013 3:06:37 PM | P | FAIL |
|
|
Phil Phone #: ###-#### gider truss a4 in backwards need fix// pe to address header back porch/ redesign interior sheer by fire place// web braces a/a4// engineer field reviewed fab weld note plan review.
|
BLD13-02148
| BLD-Framing/Rough-in | 10/30/2013 | 10/30/2013 | 10/30/2013 3:03:33 PM | P | PART |
|
|
Phil-Shear insepction please Phone #: ###-#### c/n for north portal nailling at header// h1 nailling to top plate and mlb pocket// ok to wrap the rest of the house/
|
BLD13-02561
| BLD-Foundation | 10/29/2013 | 10/30/2013 | 10/30/2013 10:19:00 AM | A | PASS |
|
|
Sean-Late morning please Phone #: ###-####
|