GCB13-00137
| GCB-Footing | 10/30/2013 | 10/30/2013 | 10/30/2013 4:05:23 PM | P | PASS |
|
|
Darrin ###-####
|
GCB13-00112
| GCB-Footing | 10/30/2013 | 10/30/2013 | 10/30/2013 3:45:22 PM | P | FAIL |
|
|
Vaughn ###-####. Provide RFI from architect for in place soffit framing, not per detail 6 on sheet A3.1. Correction notice posted.
|
BLD13-02674
| BLD-Conference | 10/30/2013 | 10/30/2013 | 10/30/2013 3:02:44 PM | P | DONE |
|
|
WES PLEASE CALL BEFORE GOING OUT Phone #: ###-####
|
BLD13-02984
| BLD-Final | 10/29/2013 | 10/30/2013 | 10/30/2013 2:44:48 PM | P | PASS |
|
|
Laurel Phone #: ###-####. ok for perm occ.
|
ESC13-00880
| Site Preparation | 10/30/2013 | 10/30/2013 | 10/30/2013 2:26:15 PM | P | PASS |
|
|
|
BLD13-02392
| BLD-Framing/Rough-in | 10/25/2013 | 10/30/2013 | 10/30/2013 2:25:37 PM | P | PART |
|
|
Clarence Phone #: ###-####. Complete airseal. Go back to plan review ti have scope of work updated. This is a whole house remodel, all sheet rock and insulation has been removed from house except for master bedroom.
|
BLD13-02849
| BLD-Framing/Rough-in | 10/30/2013 | 10/30/2013 | 10/30/2013 1:53:05 PM | P | PASS |
|
|
paul Phone #: ###-####. INterior steel stud walls ok.
|
BLD13-02170
| BLD-Final | 10/29/2013 | 10/30/2013 | 10/30/2013 1:33:33 PM | P | NR |
|
|
David Phone #: ###-####. Needs electrical first.
|
BLD13-01286
| BLD-Conference | 10/30/2013 | 10/30/2013 | 10/30/2013 12:24:48 PM | A | DONE |
|
|
|
BLD13-01667
| BLD-Final | 10/30/2013 | 10/30/2013 | 10/30/2013 10:30:13 AM | A | DONE |
|
|
need to final demo permit since TI permit has perm occ.
|
BLD13-01667
| DOC - Permit Finaled | 10/30/2013 | 10/30/2013 | 10/30/2013 10:29:13 AM | P | PASS |
|
|
|