BLD14-02346
| BLD-Final | 10/29/2014 | 10/30/2014 | 10/30/2014 4:03:13 PM | P | DONE |
|
|
Install 2 sets of letters and 1 logo. ALL PRIMARY POWER BY OTHERS Phone #: ###-#### Inspection requested via web by Ken Olsen
|
BLD14-02346
| DOC - Permit Finaled | 10/30/2014 | 10/30/2014 | 10/30/2014 4:02:58 PM | P | PASS |
|
|
|
BLD14-03141
| BLD-Final | 10/29/2014 | 10/30/2014 | 10/30/2014 3:33:16 PM | P | NR |
|
|
call when on way to meet // Mike Phone #: ###-#### (alt # ###-####). Fire/life/safety failed.
|
BLD14-00213
| BLD-Energy code compliance | 10/29/2014 | 10/30/2014 | 10/30/2014 3:30:50 PM | P | PASS |
|
|
Tyler Phone #: ###-####
|
BLD14-03125
| BLD-Final | 10/28/2014 | 10/30/2014 | 10/30/2014 1:06:33 PM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by WALTER HOLLAND
|
BLD14-03125
| DOC - Permit Finaled | 10/30/2014 | 10/30/2014 | 10/30/2014 1:06:17 PM | P | PASS |
|
|
|
GCB14-00120
| GCB-Final | 10/29/2014 | 10/30/2014 | 10/30/2014 12:46:53 PM | A | PASS |
|
|
Dan ###-#### - lockbox 2380
|
GCB14-00009
| GCB-Framing | 10/29/2014 | 10/30/2014 | 10/30/2014 12:10:30 PM | A | FAIL |
|
|
Dillon ###-####. Complete all fireblocking, provide additional studs under 3rd. floor beam by stairs. Provide engineering for king studs at ground floor window opening picking up 2nd and 3rd. floor loads. ok to insulate.
|