BLD17-03237
| FIRE-Final Inspection | 10/30/2017 | 10/30/2017 | 10/30/2017 2:48:39 PM | P | PASS |
|
|
Life safety passed
|
FIR17-00544
| INSP-Final Inspection | 10/29/2017 | 10/30/2017 | 10/30/2017 2:44:17 PM | P | PASS |
|
|
Permit finaled. 401 installed on heads that had been blocked.
|
BLD06-02324
| FIRE-Final Inspection | 10/27/2017 | 10/30/2017 | 10/30/2017 2:43:38 PM | A | CANC |
|
|
As always, call when you are heading this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
|
BLD17-03763
| FIRE-Final Inspection | 10/27/2017 | 10/30/2017 | 10/30/2017 2:40:55 PM | A | PASS |
|
|
Life safety passed.
Mindy Phone #: ###-####
|
FIR17-00275
| INSP-Sprinkler Rough-in | 10/30/2017 | 10/30/2017 | 10/30/2017 2:30:56 PM | P | PASS |
|
|
Piping/pendant in riser room is ok to cover.
|
FIR17-00320
| INSP-Sprinkler Rough-in | 10/27/2017 | 10/30/2017 | 10/30/2017 1:38:27 PM | P | PASS |
|
|
Rough-in passed. Tenting passed. Piping can be covered.
|
FIR17-00611
| INSP-Sprinkler Rough-in | 10/30/2017 | 10/30/2017 | 10/30/2017 12:34:23 PM | P | FAIL |
|
|
No access to the tenant space. No inspection was performed.
|
FIR17-00433
| INSP-Sprinkler Rough-in | 10/30/2017 | 10/30/2017 | 10/30/2017 12:25:52 PM | P | FAIL |
|
|
No access to roof and the plans do not show the dry sprig ups into the combustible concealed space.
|
BLD17-02938
| FIRE-Final Inspection | 10/27/2017 | 10/30/2017 | 10/30/2017 11:47:47 AM | A | PASS |
|
|
life safety passed
|
BLD15-03489
| FIRE-Final Inspection | 10/27/2017 | 10/30/2017 | 10/30/2017 10:55:32 AM | A | PART |
|
|
TCO for 10th floor and all level 02 Rooms.
Scott Phone #: ###-####
|
FIR16-00586
| INSP-Sprinkler Rough-in | 10/27/2017 | 10/30/2017 | 10/30/2017 8:34:30 AM | A | DONE |
|
|
Duplicate inspection work an inspection I performed on Fridayl.
Tenting of sprinkler lines in units 509-519 passed. Numerous corrections made while I was on site.
|
FIR17-00325
| INSP-Sprinkler Rough-in | 10/27/2017 | 10/30/2017 | 10/30/2017 8:30:40 AM | P | PASS |
|
|
Rough-in passed. Tenting passed. Piping can be covered
|
FIR17-00321
| INSP-Sprinkler Rough-in | 10/27/2017 | 10/30/2017 | 10/30/2017 8:29:59 AM | P | PASS |
|
|
Rough-in passed. Tenting passed. Piping can be covered
|
BLD16-02415
| FIRE-Final Inspection | 10/27/2017 | 10/30/2017 | 10/30/2017 8:28:10 AM | A | PASS |
|
|
life safety passed. Fire extinguishers to be added as discussed with Mike by the next inspection.
|
FIR17-00321
| INSP-Sprinkler Rough-in | 10/27/2017 | 10/30/2017 | 10/27/2017 3:44:02 PM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|