ELE14-01038
| Final | 10/30/2018 | 10/30/2018 | 10/30/2018 3:15:05 PM | P | PASS |
|
|
no power requested...work at location done with permit # ELE14-01390
|
ELE14-01007
| DOC - Permit Expired | 10/30/2018 | 10/30/2018 | 10/30/2018 3:00:32 PM | P | PASS |
|
|
building permit expired
|
ELE14-01061
| ELE-Aging Inspection | 10/30/2018 | 10/30/2018 | 10/30/2018 2:58:40 PM | | PASS |
|
|
final scheduled
|
ELE14-01061
| Final | 10/30/2018 | 10/30/2018 | 10/30/2018 2:58:20 PM | P | PASS |
|
|
cabinet complete...ok to final
|
ELE14-01059
| Final | 10/30/2018 | 10/30/2018 | 10/30/2018 2:50:34 PM | P | PASS |
|
|
ok to final
|
ELE14-01060
| ELE-Aging Inspection | 10/30/2018 | 10/30/2018 | 10/30/2018 2:24:04 PM | | PASS |
|
|
contact made with Ralph 10/30/18 2:15 pm...text sent with info and expressed need for inspections
|
ELE18-03498
| Final | 10/29/2018 | 10/30/2018 | 10/30/2018 2:12:06 PM | P | FAIL |
|
|
Thank you Phone #: ###-#### Inspection requested via web by CHRIS CARMINE... no access...lights installed and unable to verify UL listing or proper manufacturers listing...rough inspection should have been scheduled and required...contractor needs to be on sight for inspection to verify work and locations
|
ELE18-03994
| Final | 10/30/2018 | 10/30/2018 | 10/30/2018 1:56:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall...job complete...ok to final
|
ELE18-03911
| Final | 10/30/2018 | 10/30/2018 | 10/30/2018 1:02:37 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by jamie berg...ok to final
|
ELE18-04157
| Temporary Service | 10/30/2018 | 10/30/2018 | 10/30/2018 12:47:17 PM | P | PASS |
|
|
temp service... t/s o/h new ok...in backyard
|
ELE18-04157
| Temporary Service | 10/29/2018 | 10/30/2018 | 10/30/2018 12:35:15 PM | P | CANC |
|
|
Please inspect temp service Phone #: ###-#### >> Inspection requested via web by Kevin Perez Inspection cancelled from web by: Kevin Perez
|
ELE18-03666
| Final | 10/30/2018 | 10/30/2018 | 10/30/2018 12:18:38 PM | P | PASS |
|
|
Repairs are complete. Phone #: ###-#### Inspection requested via web by Kendra Lanham... corrections complete...ok to final
|
ELE18-03994
| Final | 10/30/2018 | 10/30/2018 | 10/30/2018 10:56:52 AM | A | FAIL |
|
|
final for building E lighting Phone #: ###-#### Inspection requested via web by Todd Hall.. requirements not met from previous inspections
|
ELE18-03937
| Electrical Rough-In | 10/29/2018 | 10/30/2018 | 10/30/2018 10:41:07 AM | A | PASS |
|
|
ceiling rough in for cover upstairs and down. Phone #: ###-#### Inspection requested via web by Mark Morgan...ok to cover
|
ELE18-04038
| Final | 10/30/2018 | 10/30/2018 | 10/30/2018 10:16:57 AM | A | FAIL |
|
|
Access in to the building is around 9:00 a.m. all receptacles and 220 circuits operable. Dishwasher Disconnect accessible and operable. Receptacles in counter raceway accessible by removal of panel and are cord and plug connected. Phone #: ###-#### Inspection requested via web by Anastacio Fuentes... 1..panel shall be labelled to identify its clear, evident, and specific purpose or use...408.4 2..all single pahase and 3 phase recpticles shall have GFI protection under 50A...210.8(B) 3..verify insta hot breaker size and rating...408.4 4..wall outlets cord connected not on rated circuit..14AWG wire/cord...15Amp circuit..110.3
|
ELE18-04129
| Electrical Rough-In | 10/29/2018 | 10/30/2018 | 10/30/2018 9:21:35 AM | A | PASS |
|
|
Micha Phone #: ###-####... UL listed equipment breaker will be added to all-in-one discussed getting electrical permit for work being done by licensed electrician before starting work
|
ELE18-02295
| Electrical Rough-In | 10/29/2018 | 10/30/2018 | 10/30/2018 8:43:59 AM | A | PASS |
|
|
South wall of gym and hallway soffit lights along with hard lids in restrooms. Phone #: ###-#### Inspection requested via web by Debby Pierce... areas stated approved for cover
|
ELE13-03331
| ELE-Aging Inspection | 10/30/2018 | 10/30/2018 | 10/30/2018 7:40:16 AM | | FAIL |
|
|
been contacted multiple times on need of final inspection
|