MIS18-00414
| BLD-Conference | 10/24/2018 | 10/25/2018 | | A | |
|
|
per Dan E-working w/o permits
|
BLD18-01301
| BLD-Energy code compliance | 10/30/2018 | 10/30/2018 | 10/30/2018 3:57:44 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD18-01301
| BLD-Framing/Rough-in | 10/30/2018 | 10/30/2018 | 10/30/2018 3:57:32 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD17-04467
| BLD-Final | 10/30/2018 | 10/30/2018 | 10/30/2018 3:07:16 PM | P | NR |
|
|
Brain Phone #: ###-####. Needs to complete handrail extensions
|
BLD17-04626
| BLD-Energy code compliance | 10/29/2018 | 10/30/2018 | 10/30/2018 1:54:16 PM | P | PART |
|
|
building D, insulation and vapor barriers. gypcrete under tubs. Phone #: ###-#### Inspection requested via web by J.C. Murray. Noted furred areas behind tub/shower at ceiling has not been pre rocked. Also noted possible non rated low voltage boxes that have been installed. no one from petra on site and no awnser on phone call. Insulation, vapor barrier and gyp crete under tubs ok.
|
BLD18-00445
| BLD-Foundation | 10/29/2018 | 10/30/2018 | 10/30/2018 10:24:32 AM | A | DEFR |
|
|
rebar // Noah Phone #: ###-####. Complted By #415.
|
BLD18-02185
| BLD-Footing | 10/29/2018 | 10/30/2018 | 10/30/2018 10:11:12 AM | A | NR |
|
|
Cleve Phone #: ###-####, upper retaining wall. No soils report.
|
BLD18-03891
| BLD-Final | 10/25/2018 | 10/30/2018 | 10/30/2018 9:38:06 AM | A | PASS |
|
|
Lynee Phone #: ###-#### OK for Perm Occ.
|
BLD18-03783
| BLD-Final | 10/29/2018 | 10/30/2018 | 10/30/2018 9:22:41 AM | A | NR |
|
|
Jerry Phone #: ###-####. fire/life/safety failed.
|
BLD18-01191
| BLD-Foundation | 10/29/2018 | 10/30/2018 | 10/30/2018 9:22:13 AM | A | PASS |
|
|
Requesting a foundation inspection for the trash enclosure. Thank you Phone #: ###-#### Inspection requested via web by Markus Schlegel
|
BLD18-00455
| BLD-Energy code compliance | 10/29/2018 | 10/30/2018 | 10/30/2018 8:52:14 AM | A | PASS |
|
|
James Phone #: ###-####
|