MIS00-00216
| BLD-Final | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | FAIL |
|
|
Mark ###-#### reinspection Mark ###-#### called and left message to contact dave h. no information to do inspection.reinspection 10/31/2000 11:33:42 AM
|
BLD00-01146
| BLD-Framing/Rough-in | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PART |
|
|
FR INSP-- CARL ###-#### NOT FOR MODIFICATION stud framing ok/ need engineering for tube steel. pending mez erection. 10/31/2000 2:05:25 PM
|
BLD00-01783
| BLD-Footing | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PART |
|
|
Keith ###-#### work in progess covered with special insp. / need colum anchor bolt epoxy lay out missed. from engineer. 10/31/2000 8:52:56 AM
|
BLD00-01590
| BLD-Footing | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PASS |
|
|
Pete ###-####
|
BLD00-02026
| BLD-Conference | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PASS |
|
|
Dutch Wilkenson ###-#### special insp. on project. fax code section of 711.3 to jerry frank. 10/31/2000 10:40:11 AM
|
BLD00-01563
| BLD-Concrete | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 09:09:58. Contact: ###-####. placed with special insp. pe nding report.10/31/2000 4:59:41 PM 10/31/2000 5:00:07 PM
|
BLD99-02413
| BLD-Final | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | CANC |
|
|
FN INSP- TIM ###-#### CALL 1ST BEFORE INSP
|
BLD00-00894
| BLD-Final | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
Jack 371*6699 fire is also going out co ok. 10/31/2000 4:37:06 PM
|
BLD00-00894
| BLD-Final | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
Jack 371*6699 fire is also going out co ok. 10/31/2000 4:37:06 PM
|
BLD00-02601
| BLD-Final | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
###-####
|