PLM00-03751
| Water and/or Sewer | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM00-03752
| Water and/or Sewer | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PASS |
|
|
WATER LINE ONLY JAN ###-####
|
PLM00-03131
| Final | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 15:12:25. Contact: ###-####.
|
PLM00-03215
| Plumbing Rough-in | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 15:40:39. Contact: ###-####.
|
PLM00-02169
| Plumbing Rough-in | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 10/30/2000 water in island ok to cover island 10/31/2000 11:42:58 AM
|
PLM00-03700
| Water and/or Sewer | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 10/31/2000 2 joints past mh 2
|
PLM00-02078
| Water and/or Sewer | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 10/31/2000 1 1/2' to hydrants test ok
|
PLM00-03700
| Water and/or Sewer | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 10/31/2000 next 4 joints ok
|
PLM00-03766
| Sprinkler (Final) | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | FAIL |
|
|
###-#### provide 2 unions on dcva 10/31/2000 3:06:17 PM
|
PLM00-03189
| Final | 10/30/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/30/2000 at 16:42:11. Contact: ###-####.
|
PLM00-03758
| Groundwork | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 09:08:38. Contact: ###-####.
|
PLM00-03762
| Final | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 09:26:56. Contact: ###-####. zone valves are not alowed down stream of av 10/31/2000 1:56:23 PM , up grade sprinkler system, call for reinspection, ok to cover water service piping. 10/31/2000 1:56:59 PM
|
PLM00-03764
| Plumbing Rough-in | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
R/I CRAIG ###-####
|
PLM00-03763
| Plumbing Rough-in | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 09:53:51. Contact: ###-####. ri ok still need to run the relief line to the outside access not to bad from the addition 10/31/2000 4:35:55 PM
|
PLM00-03387
| Plumbing Rough-in | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
R/I -RE-INSP MARY -###-####--KEY ABOVE ELEC BOX
|
PLM00-03679
| Plumbing Rough-in | 10/31/2000 | 10/31/2000 | 10/31/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/31/2000 at 10:07:15. Contact: ###-####.
|