FIR01-00360
| INSP-Sprinkler Rough-in/Hydro | 10/30/2001 | 10/31/2001 | 10/31/2001 12:00:00 AM | P | PART |
|
|
add head north side riser room, install EQ bracing, heads overspace in southwest corner, northwest sprig ups to far from deck, need to see east concealed space 11/1/2001 2:47:26 PM
|
BLD01-00814
| FIRE-Final Inspection | 10/30/2001 | 10/31/2001 | 10/31/2001 12:00:00 AM | P | CANC |
|
|
wrong inspector 10/31/2001 2:53:28 PM
|
BLD01-00812
| FIRE-Final Inspection | 10/30/2001 | 10/31/2001 | 10/31/2001 12:00:00 AM | P | CANC |
|
|
phone lines not in 10/31/2001 2:53:58 PM
|
BLD01-00747
| FIRE-Final Inspection | 10/30/2001 | 10/31/2001 | 10/31/2001 12:00:00 AM | P | CANC |
|
|
phone lines not in 10/31/2001 2:54:09 PM
|
FIR01-00460
| INSP-Sprinkler Rough-in/Hydro | 10/31/2001 | 10/31/2001 | 10/31/2001 12:00:00 AM | P | FAIL |
|
|
Hydro test failed for 2nd floor south. Contractor to reschedule 10/31/2001 2:49:32 PM
|
FIR01-00421
| INSP-Final Inspection | 10/31/2001 | 10/31/2001 | 10/31/2001 12:00:00 AM | P | CANC |
|
|
Cancelled by contractor 11/1/2001 7:44:54 AM
|