Inspections for the day of: Thursday, October 31, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02288 Final10/30/200210/31/200210/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/30/2002 at 12:10:49. Contact: ###-####.
PLM02-02220 Final10/30/200210/31/200210/31/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/30/2002 at 12:22:07. Contact: ###-####. need to provide r.p. for coffee and hot chocolate machine need separate double check on tea and fruit drink machine need to provide separate water supply for soap dispencer unit 10/31/2002 12:53:47 PM
PLM02-02963 Groundwork10/30/200210/31/200210/31/2002 12:00:00 AMAPASS
LEO; Phone #: ###-#### Internet Inspection Request from: Darla Downs
PLM02-02942 Final10/30/200210/31/200210/31/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/30/2002 at 15:56:09. Contact: ###-####. need to provide r.p. for ice cream machine oked temp 10/31/2002 12:43:38 PM
PLM02-02957 Roof Drains10/31/200210/31/200210/31/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/31/2002 at 02:14:35. Contact: ###-####. need to fix leak and retest on north east over flow roof drain 10/31/2002 1:42:39 PM
PLM02-02996 Roof Drains10/31/200210/31/200210/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/31/2002 at 02:17:03. Contact: ###-####.
PLM02-01540 Roof Drains10/31/200210/31/200210/31/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/31/2002 at 08:00:34. Contact: ###-####. roof drain,s and over flow,s on upper level of south side of building test ok 10/31/2002 3:16:55 PM
PLM02-03335 Water and/or Sewer10/31/200210/31/200210/31/2002 12:00:00 AMPPASS
PLM02-03336 Water and/or Sewer10/31/200210/31/200210/31/2002 12:00:00 AMPPASS
PLM02-02922 Plumbing Rough-in10/30/200210/31/200210/31/2002 12:00:00 AMPPART
after 1pm ###-#### need to to install tub&shower valve and test 10/31/2002 5:18:12 PM
PLM01-03757 Final10/30/200210/31/200210/31/2002 12:00:00 AMPPASS