ELE05-03304
| Final | 10/28/2005 | 10/31/2005 | 10/31/2005 4:19:13 PM | P | PASS |
|
|
travis ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie called contr, left message, said need adress, disposal and dw installed, ok to final
|
ELE05-02862
| Final | 10/31/2005 | 10/31/2005 | 10/31/2005 4:17:42 PM | P | PASS |
|
|
tracy note: be gone 3:00-400 to pick up kids; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles told owner to make recpt flush w/faceplate, ok to final
|
ELE05-03270
| Final | 10/31/2005 | 10/31/2005 | 10/31/2005 3:39:11 PM | P | PASS |
|
|
###-#### - rocky ok to final
|
ELE05-03002
| Final | 10/31/2005 | 10/31/2005 | 10/31/2005 2:42:19 PM | P | FAIL |
|
|
tom ###-#### called, left message, left corr. notice, 406.4 recpts shall be rigidly secured, 406.4(D) recpts shall project from faceplates or be flush, 210.8(A)(6) kitchen recpts shall have gfci protection, 210.8(A)(2) garage gfci shall operate, 314.23(C) enclosures shall be rigidly mtd and recpts to enclosure
|
ELE05-03781
| Rough-In Permanent Service | 10/31/2005 | 10/31/2005 | 10/31/2005 2:29:24 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/31/2005 at 8:00:52 AM. Contact: ###-####. gec ok to cover, ric ok, p/s u/g n ok
|
ELE05-03675
| Final | 10/31/2005 | 10/31/2005 | 10/31/2005 12:41:15 PM | A | PASS |
|
|
wiring completed with disconnect switch on side of building.; Phone #: ###-#### Internet Inspection Request from: dennis mcneely ok to final
|
ELE05-03591
| Permanent Service | 10/31/2005 | 10/31/2005 | 10/31/2005 11:45:28 AM | P | PASS |
|
|
###-#### - kendall p/s exst meter pak ok
|
ELE05-02838
| Final | 10/28/2005 | 10/31/2005 | 10/31/2005 11:44:40 AM | A | PASS |
|
|
elaina; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to final
|
ELE05-03780
| Electrical Rough-In | 10/29/2005 | 10/31/2005 | 10/31/2005 10:21:58 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/29/2005 at 9:23:51 AM. Contact: ###-####. clg and front walls ok and back walls only ok to cover
|
ELE05-02260
| Final | 10/28/2005 | 10/31/2005 | 10/31/2005 10:19:38 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/28/2005 at 3:19:09 PM. Contact: ###-####. signed t/o card, left corr notice, 110.3 atm and screen lifts shall be listed408.5 panel schedules shall be in place, lv transformers and boxes shall be closed and bushings in boxes
|
ELE05-03629
| Final | 10/28/2005 | 10/31/2005 | 10/31/2005 10:15:32 AM | A | PART |
|
|
###-#### - kendall ok to final
|
ELE04-04022
| Final | 10/28/2005 | 10/31/2005 | 10/31/2005 10:14:11 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/28/2005 at 3:22:02 PM. Contact: ###-####. signed t/o card, need to install hall heaters, left corr notice
|
ELE05-02898
| Final | 10/31/2005 | 10/31/2005 | 10/31/2005 8:55:01 AM | P | CANC |
|
|
please call 30min prior to meet you//eric; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Inspection cancelled from web by: Marsha Smylie
|