MEC06-03617
| Rough-in | 10/30/2006 | 10/31/2006 | 10/31/2006 8:06:17 PM | A | NR |
|
|
roughin - travis; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen..i rescheduled this for wed am
|
MEC06-03608
| Rough-in | 10/31/2006 | 10/31/2006 | 10/31/2006 5:08:20 PM | P | PART |
|
|
Please do gas pressure witness test with mechanical rough in inspection. Thank You!; Phone #: ###-#### Internet Inspection Request from: Donnette Ellis...insulation around metal duct above furnace falling off and metal showing..20lb test ok..f/p's not installed yet..please call me..thanks dixie
|
MEC06-03624
| Pressure Test | 10/31/2006 | 10/31/2006 | 10/31/2006 5:03:06 PM | P | PASS |
|
|
gilbert ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..2--100lb tests on hydronics ok
|
MEC06-01923
| Final | 10/30/2006 | 10/31/2006 | 10/31/2006 5:01:40 PM | A | NR |
|
|
dallas - note: call 1/2 hr prior to going out ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith....dallas will reschedule..we couldn't meet up today
|
MEC06-00211
| Final | 10/30/2006 | 10/31/2006 | 10/31/2006 2:45:14 PM | A | FAIL |
|
|
Thank you!; Phone #: ###-#### Internet Inspection Request from: Becky Sucher..hi becky, i posted the corrections on the furnace
|
MEC06-03427
| Pressure Test | 10/31/2006 | 10/31/2006 | 10/31/2006 1:08:05 PM | P | PASS |
|
|
20lb ok..i scheduled this so int gas would be able to find it on the computer..thanks dixie
|
MEC06-03427
| Rough-in | 10/30/2006 | 10/31/2006 | 10/31/2006 1:07:09 PM | A | PASS |
|
|
Phone #: ###-#### x222 Internet Inspection Request from: Rhiannon Stuck
|