FIR06-00011
| INSP-Alarm Testing | 10/31/2007 | 10/31/2007 | 11/1/2007 10:16:41 AM | P | CANC |
|
|
Overbooked to be rescheduled.
|
BLD07-00987
| FIRE-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 6:31:12 PM | A | FAIL |
|
|
Provide approved door hardware including on the sliding door.
|
FIR07-00671
| INSP-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 6:29:03 PM | A | DONE |
|
|
See mike timmermans notes for items tested.
|
BLD06-02950
| FIRE-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 6:27:22 PM | A | FAIL |
|
|
See the job site correction notice for items needing correcting.
|
FIR07-00878
| INSP-Final Inspection | 10/31/2007 | 10/31/2007 | 10/31/2007 6:25:47 PM | A | FAIL |
|
|
Make modifications to the duct smoke detector mounting, provide additional smoke detector on the north side of the fire door as discussed and change the existing riser from a trouble signal to a fire alarm signal.
|
FIR07-00477
| INSP-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 6:22:55 PM | A | PASS |
|
|
permit finaled
|
BLD06-03284
| FIRE-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 6:17:21 PM | P | PASS |
|
|
Life safety finaled
|
BLD07-00986
| FIRE-Conference | 10/30/2007 | 10/31/2007 | 10/31/2007 6:16:10 PM | A | DONE |
|
|
I went over life safety requirements with the builder. He stated that he was going to install two vehicle gates. One on the south side of the building and the other on the north. I told him he needs fire dept approval for this. I told him about none hardened locks and the opticom systems.
|
BLD07-02800
| FIRE-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 1:36:53 PM | P | PART |
|
|
A temporary occupancy was given until the thumbturn is removed from the main exit, approved hardware is installed on the west exit door and the electrical outlets are covered.
|
FIR07-00633
| FIR-Aging Inspection | 10/31/2007 | 10/31/2007 | 10/31/2007 1:02:03 PM | | NR |
|
|
work is in progress
|
FIR07-00461
| INSP-Sprinkler Rough-in | 10/30/2007 | 10/31/2007 | 10/31/2007 1:00:35 PM | A | PASS |
|
|
The underground piping is ok to cover but the installation does not match the plans. Additional fitting have been added as well as additional piping. I'm contacting DeBest Fire about my concerns.
|
FIR07-00586
| INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 12:11:41 PM | A | FAIL |
|
|
Overhead hydro failed due to loss of pressure and the fdc not being tested.
|
FIR07-00582
| INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 12:11:12 PM | A | FAIL |
|
|
Overhead hydro failed due to loss of pressure and the fdc not being tested.
|
FIR07-00585
| INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 12:10:49 PM | A | FAIL |
|
|
Overhead hydro failed due to loss of pressure and the fdc not being tested.
|
FIR07-00584
| INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 12:10:07 PM | A | FAIL |
|
|
Overhead hydro failed due to loss of pressure and the fdc not being tested.
|
FIR07-00581
| INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 12:09:17 PM | A | FAIL |
|
|
Overhead hydro failed due to loss of pressure and the fdc not being tested.
|
FIR07-00583
| INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 12:08:51 PM | A | FAIL |
|
|
Overhead hydro failed due to loss of pressure and the fdc not being tested.
|
FIR07-00580
| INSP-Sprinkler Rough-in/Hydro | 10/30/2007 | 10/31/2007 | 10/31/2007 11:48:13 AM | A | FAIL |
|
|
Overhead hydro failed due to loss of pressure and the fdc not being tested.
|
BLD07-02823
| FIRE-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 11:46:02 AM | A | FAIL |
|
|
The tenant space needs sprinkler work which will require a permit, cover the electrical outlets, provide the usual sticker at the main exit and provide an approved fire extinguisher with tag as discussed.
|
FIR07-00642
| INSP-Final Inspection | 10/30/2007 | 10/31/2007 | 10/31/2007 7:24:05 AM | A | FAIL |
|
|
401canopies need to be installed in the restrooms where lights are blocking pendant heads. One head needs to be added at a fixture on the sales floor and two heads are located too close to one another at another fixture on the sales floor. Plans need to be resubmitted to the city of boise due to the amount of added heads caused by the fixtures. The scope of work calls for the air compressor to be changed out which has not been done yet.
|
FIR07-00735
| INSP-Sprinkler Rough-in | 10/30/2007 | 10/31/2007 | 10/31/2007 7:23:31 AM | A | FAIL |
|
|
401canopies need to be installed in the restrooms where lights are blocking pendant heads. One head needs to be added at a fixture on the sales floor and two heads are located too close to one another at another fixture on the sales floor. Plans need to be resubmitted to the city of boise due to the amount of added heads caused by the fixtures. The scope of work calls for the air compressor to be changed out which has not been done yet.
|
FIR07-00632
| FIR-Aging Inspection | 10/31/2007 | 10/31/2007 | 10/31/2007 6:19:42 AM | | NR |
|
|
work is in progress
|