BLD08-01658
| BLD-Aging Inspection | 10/31/2008 | 10/31/2008 | 11/4/2008 9:52:19 AM | | PASS |
|
|
wip.
|
BLD08-01868
| BLD-Framing/Rough-in | 10/31/2008 | 10/31/2008 | 10/31/2008 4:34:48 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 9:02:05 AM. Contact: ###-####. Reviewed RFI from engineer and architect concering changeat demissing wall for studs supporting second floor TJI. All in place work was as per RFI. Will have RFI scanned into permit.
|
ESC08-00268
| Site Final | 10/31/2008 | 10/31/2008 | 10/31/2008 3:58:43 PM | P | PASS |
|
|
70% reveg. ok.
|
BLD08-00833
| BLD-Final | 10/31/2008 | 10/31/2008 | 10/31/2008 3:42:15 PM | P | NR |
|
|
Grant Phone #: ###-####. Needs elec. final first.
|
BLD08-00696
| BLD-Final | 10/31/2008 | 10/31/2008 | 10/31/2008 3:41:52 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 6:33:15 AM. Contact: ###-####.
|
BLD08-00696
| DOC - Permit Finaled | 10/31/2008 | 10/31/2008 | 10/31/2008 3:41:45 PM | P | PASS |
|
|
|
BLD08-01574
| BLD-Final | 10/31/2008 | 10/31/2008 | 10/31/2008 3:41:01 PM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 6:58:42 AM. Contact: ###-####. Will be ok when plumbing finals.
|
BLD08-02324
| BLD-Footing | 10/31/2008 | 10/31/2008 | 10/31/2008 3:38:53 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/31/2008 at 6:25:15 AM. Contact: ###-####.
|
ESC08-00951
| Random Inspection | 10/31/2008 | 10/31/2008 | 10/31/2008 3:38:39 PM | P | PASS |
|
|
|
BLD08-01853
| BLD-Final | 10/31/2008 | 10/31/2008 | 10/31/2008 2:15:14 PM | P | PASS |
|
|
matt Phone #: ###-####. Verified tempered glazing at hazordous loacations. ok for perm occ.
|
ESC08-00330
| Random Inspection | 10/31/2008 | 10/31/2008 | 10/31/2008 1:59:50 PM | P | PASS |
|
|
|
BLD08-00811
| BLD-Framing/Rough-in | 10/30/2008 | 10/31/2008 | 10/31/2008 1:59:39 PM | P | PASS |
|
|
bill Phone #: ###-####. ok to insul.
|
ESC08-00512
| Random Inspection | 10/31/2008 | 10/31/2008 | 10/31/2008 10:58:34 AM | A | PASS |
|
|
General site conditions were good.
|
BLD08-01168
| BLD-Other | 10/30/2008 | 10/31/2008 | 10/31/2008 10:57:46 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/30/2008 at 12:55:15 PM. Contact: ###-####. Masonry wing wall and added parapet at 3hr. wall location. Also reviewed special insp. reports. Also recieved and submitted calcs from architect for 3hr. hallow core precast panel.
|
BLD08-01168
| BLD-Framing/Rough-in | 10/30/2008 | 10/31/2008 | 10/31/2008 10:54:58 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/30/2008 at 12:54:35 PM. Contact: ###-####. Framing for added stairway. Plan mod has been submitted to city per contractor.
|
ESC06-00656
| Site Final | 10/31/2008 | 10/31/2008 | 10/31/2008 10:53:36 AM | P | PASS |
|
|
All work has been completed. 70% reveg ok. AllBMP's have been removed.
|
BLD08-02040
| BLD-Final | 10/30/2008 | 10/31/2008 | 10/31/2008 10:52:35 AM | A | PASS |
|
|
keith Phone #: ###-####
|
BLD08-02040
| DOC - Permit Finaled | 10/31/2008 | 10/31/2008 | 10/31/2008 10:52:28 AM | P | PASS |
|
|
Letter of compliance issued. Verified all required signatures.
|
BLD08-01853
| BLD-Final | 10/30/2008 | 10/31/2008 | 10/31/2008 9:58:55 AM | A | PART |
|
|
matt Phone #: ###-####. Ok for temp occ. Will Need to verify tempered glazing at hazardous locations when installed.
|
BLD08-01321
| BLD-Footing | 10/30/2008 | 10/31/2008 | 10/31/2008 9:38:11 AM | A | PASS |
|
|
logan Phone #: ###-####. Footing for permiter screen wall, South and west portions of site. Special insp. also on site.
|
ESC08-00532
| Random Inspection | 10/31/2008 | 10/31/2008 | 10/31/2008 9:37:03 AM | A | PART |
|
|
Still needs to post ESC sign. Contacted Larry Kincaid (RP) And told him to have sign posted by today. All other BMP's in place. General site conditions were ok.
|