Inspections for the day of: Friday, October 31, 2008.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01658 BLD-Aging Inspection10/31/200810/31/200811/4/2008 9:52:19 AM PASS
wip.
BLD08-01868 BLD-Framing/Rough-in10/31/200810/31/200810/31/2008 4:34:48 PMPPART
Scheduled by a contractor via Hello! on 10/31/2008 at 9:02:05 AM. Contact: ###-####. Reviewed RFI from engineer and architect concering changeat demissing wall for studs supporting second floor TJI. All in place work was as per RFI. Will have RFI scanned into permit.
ESC08-00268 Site Final10/31/200810/31/200810/31/2008 3:58:43 PMPPASS
70% reveg. ok.
BLD08-00833 BLD-Final10/31/200810/31/200810/31/2008 3:42:15 PMPNR
Grant Phone #: ###-####. Needs elec. final first.
BLD08-00696 BLD-Final10/31/200810/31/200810/31/2008 3:41:52 PMAPASS
Scheduled by a contractor via Hello! on 10/31/2008 at 6:33:15 AM. Contact: ###-####.
BLD08-00696 DOC - Permit Finaled10/31/200810/31/200810/31/2008 3:41:45 PMPPASS
BLD08-01574 BLD-Final10/31/200810/31/200810/31/2008 3:41:01 PMACANC
Scheduled by a contractor via Hello! on 10/31/2008 at 6:58:42 AM. Contact: ###-####. Will be ok when plumbing finals.
BLD08-02324 BLD-Footing10/31/200810/31/200810/31/2008 3:38:53 PMPPASS
Scheduled by a contractor via Hello! on 10/31/2008 at 6:25:15 AM. Contact: ###-####.
ESC08-00951 Random Inspection10/31/200810/31/200810/31/2008 3:38:39 PMPPASS
BLD08-01853 BLD-Final10/31/200810/31/200810/31/2008 2:15:14 PMPPASS
matt Phone #: ###-####. Verified tempered glazing at hazordous loacations. ok for perm occ.
ESC08-00330 Random Inspection10/31/200810/31/200810/31/2008 1:59:50 PMPPASS
BLD08-00811 BLD-Framing/Rough-in10/30/200810/31/200810/31/2008 1:59:39 PMPPASS
bill Phone #: ###-####. ok to insul.
ESC08-00512 Random Inspection10/31/200810/31/200810/31/2008 10:58:34 AMAPASS
General site conditions were good.
BLD08-01168 BLD-Other10/30/200810/31/200810/31/2008 10:57:46 AMAPART
Scheduled by a contractor via Hello! on 10/30/2008 at 12:55:15 PM. Contact: ###-####. Masonry wing wall and added parapet at 3hr. wall location. Also reviewed special insp. reports. Also recieved and submitted calcs from architect for 3hr. hallow core precast panel.
BLD08-01168 BLD-Framing/Rough-in10/30/200810/31/200810/31/2008 10:54:58 AMAPASS
Scheduled by a contractor via Hello! on 10/30/2008 at 12:54:35 PM. Contact: ###-####. Framing for added stairway. Plan mod has been submitted to city per contractor.
ESC06-00656 Site Final10/31/200810/31/200810/31/2008 10:53:36 AMPPASS
All work has been completed. 70% reveg ok. AllBMP's have been removed.
BLD08-02040 BLD-Final10/30/200810/31/200810/31/2008 10:52:35 AMAPASS
keith Phone #: ###-####
BLD08-02040 DOC - Permit Finaled10/31/200810/31/200810/31/2008 10:52:28 AMPPASS
Letter of compliance issued. Verified all required signatures.
BLD08-01853 BLD-Final10/30/200810/31/200810/31/2008 9:58:55 AMAPART
matt Phone #: ###-####. Ok for temp occ. Will Need to verify tempered glazing at hazardous locations when installed.
BLD08-01321 BLD-Footing10/30/200810/31/200810/31/2008 9:38:11 AMAPASS
logan Phone #: ###-####. Footing for permiter screen wall, South and west portions of site. Special insp. also on site.
ESC08-00532 Random Inspection10/31/200810/31/200810/31/2008 9:37:03 AMAPART
Still needs to post ESC sign. Contacted Larry Kincaid (RP) And told him to have sign posted by today. All other BMP's in place. General site conditions were ok.