Inspections for the day of: Monday, October 31, 2011.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-01344 FIRE-Final Inspection10/28/201110/31/201110/31/2011 3:24:22 PMPPASS
life safety passed
FIR11-00404 INSP-Final Inspection10/31/201110/31/201110/31/2011 3:14:47 PMPPASS
The hood suppression system functioned correctly. Permit finaled.
FIR11-00405 INSP-Final Inspection10/31/201110/31/201110/31/2011 3:14:03 PMPPASS
The hood suppression system functioned correctly. Permit finaled.
FIR11-00428 INSP-Final Inspection10/31/201110/31/201110/31/2011 3:12:44 PMPPASS
permit finaled.
BLD11-02221 FIRE-Final Inspection10/31/201110/31/201110/31/2011 2:11:26 PMPFAIL
The project related fire sprinkler permit needs addressed. Also the correct hardware needs to be installed on the restroom door and a tagged fire extinguisher installed.
FIR11-00564 INSP-Final Inspection10/31/201110/31/201110/31/2011 2:10:26 PMPFAIL
One upright sprinkler head was forgotten to be installed and another on the opposite side of the wall needs to be relocated so that it provides coverage down both sides of a corner wall.
FIR11-00564 INSP-Sprinkler Rough-in10/31/201110/31/201110/31/2011 2:09:46 PMPFAIL
One upright sprinkler head was forgotten to be installed and another on the opposite side of the wall needs to be relocated so that it provides coverage down both sides of a corner wall.
BLD11-01913 FIRE-Final Inspection10/28/201110/31/201110/31/2011 1:42:11 PMAFAIL
The project related fire sprinkler permit has not be scheduled for a final inspection and there is a missing exit sign out the west corridor.
FIR11-00469 INSP-Final Inspection10/27/201110/31/201110/31/2011 10:29:59 AMAPASS
permit finaled
FIR11-00554 INSP-Final Inspection10/27/201110/31/201110/31/2011 10:29:38 AMAPASS
permit finaled
BLD11-00788 FIRE-Final Inspection10/31/201110/31/201110/31/2011 8:55:20 AMAFAIL
Life safety in phase II is passed.
FIR11-00294 INSP-Final Inspection10/27/201110/31/201110/31/2011 8:26:09 AMAFAIL
All items are ok and work is complete in the new T.I. area, including EOL voltage drops, except that Winco is using a large existing office in the very north east corner of the building for a conference room/break room. This area will require a notification device. Per the onsite verbal agreement this single notification add will be handled with an as-built.