Inspections for the day of: Wednesday, October 31, 2012.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl Spivey
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM12-02179 Final10/31/201210/31/201210/31/2012 3:48:53 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Tom Soniville
PLM12-02507 Groundwork10/31/201210/31/201210/31/2012 3:34:51 PMPPASS
request ground works inspection for sewer tie-in. Phone #: ###-#### >> Inspection requested via web by Ken Jones
tie in to ejector...........ds
PLM12-01755 Sprinkler (Final)10/31/201210/31/201210/31/2012 3:15:37 PMPPASS
PLM12-01755 PLM-Aging Inspection10/31/201210/31/201210/31/2012 3:15:05 PMPPASS
PLM12-02685 Groundwork10/31/201210/31/201210/31/2012 2:35:24 PMPPASS
PLM12-02685 Water and/or Sewer10/31/201210/31/201210/31/2012 2:35:06 PMPCANC
inspection for ground work needed Phone #: ###-#### >> Inspection requested via web by Kelly Munro
GCP12-00135 GCP-Final10/30/201210/31/201210/31/2012 1:53:07 PMPPASS
###-####
PLM12-01756 Water and/or Sewer10/31/201210/31/201210/31/2012 11:02:54 AMAPART
Last entry by mistake

tie in from flammable intercepter to six inch building drain done and passed ok.......ds
PLM12-01755 PLM-Aging Inspection10/31/201210/31/201210/31/2012 10:59:25 AM PART
Tie in from flammable intercepter to 6 inch waste line installed and passed ok...........ds
PLM12-02682 Water Heater Final10/30/201210/31/201210/31/2012 10:57:04 AMAFAIL
Phone #: ###-#### >> Inspection requested via web by Shane Loarneed to run pan drain to floor and also run T&P to floor and not into pan............ds
PLM12-01756 Water and/or Sewer10/30/201210/31/201210/31/2012 10:54:26 AMAFAIL
Tim Phone #: ###-####
Pan drain not installed correctly and T&P needs to be ran to within 6 inches of floor. T&P drain not to be drained into pan..............ds