FIR13-00579
| INSP-Sprinkler Rough-in | 10/31/2013 | 10/31/2013 | 11/1/2013 6:50:45 AM | P | PART |
|
|
Rough-in inspection for the 3rd floor unit rooms only- Identified concealed combustible spaces at some areas in need of coverage or meet allowable conditions per NFPA 13. Clarify if space between ceiling and deck above the kitchens will be sheetrocked. Plan modification to include deleted pendents at the end of lines in some units. Branchlines and head spacing okayed.
|
FIR13-00440
| INSP-Sprinkler Rough-in | 10/31/2013 | 10/31/2013 | 11/1/2013 6:42:30 AM | P | PART |
|
|
Rough-in for the 7th floor completed- okay to cover areas with sheetrock ceilings at the RR's and hallway. Missing coverage at one closet per plan- ref. dated annotation. Also noted lacking coverage (existing conditions) at the elevator machine room, penthouse, and some areas between floor levels of the basement, 1st and 2nd.
|
BLD13-01618
| FIRE-Final Inspection | 10/31/2013 | 10/31/2013 | 11/1/2013 6:34:05 AM | P | NR |
|
|
Final pending project related fire sprinkler permit work.
|
FIR06-00798
| INSP-Final Inspection | 10/29/2013 | 10/31/2013 | 11/1/2013 6:32:58 AM | A | PASS |
|
|
Fire alarm work passed functional testing. Permit final approved.
|
BLD13-03009
| FIRE-Final Inspection | 10/30/2013 | 10/31/2013 | 10/31/2013 12:00:00 AM | P | PASS |
|
|
Dale Phone #: ###-####
|