Inspections for the day of: Friday, October 31, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCraig D. Hanson
TitleFIRE CODE PLANS EXAMINER
Phone #794-6264
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00340 INSP-Final Inspection10/31/201410/31/201411/3/2014 8:00:50 AMPPASS
PAss
FIR14-00794 INSP-Final Inspection10/30/201410/31/201410/31/2014 3:45:16 PMPPASS
New panel tested and passed
FIR14-00775 INSP-Sprinkler Rough-in10/30/201410/31/201410/31/2014 2:25:57 PMPPART
ths was for hard lips in NW area of shop. pass
NAF14-00006 INSP-Sprinkler Rough-in/Hydro10/30/201410/31/201410/31/2014 2:11:25 PMPFAIL
heads need to installed in fireplace chase's. head needs installed in new room 1st floor S unit. As builts need to be submitted. Re-hydro after instilation of heads.
FIR14-00470 INSP-Sprinkler Rough-in/Hydro10/30/201410/31/201410/31/2014 2:10:55 PMPFAIL
heads need to installed in fireplace chase's. head needs installed in new room 1st floor S unit. As builts need to be submitted. Re-hydro after instilation of heads.
FIR14-00783 INSP-Sprinkler Rough-in10/31/201410/31/201410/31/2014 11:34:38 AMPPASS
underground stub
FIR14-00604 INSP-Sprinkler Rough-in10/30/201410/31/201410/31/2014 10:44:41 AMAPART
3rd floor dry system rough in inspected and pass with as builts. 3rd floor wet system corections inspected and pass. CDH
BLD14-00613 FIRE-Final Inspection10/30/201410/31/201410/31/2014 10:41:51 AMPPART
1.Exit sign on main door needs to be installed. 2. bug eyes need added in back hallway by restrooms 3. verbal verification of smoke detector in HVAC units working.