FIR14-00340
| INSP-Final Inspection | 10/31/2014 | 10/31/2014 | 11/3/2014 8:00:50 AM | P | PASS |
|
|
PAss
|
FIR14-00794
| INSP-Final Inspection | 10/30/2014 | 10/31/2014 | 10/31/2014 3:45:16 PM | P | PASS |
|
|
New panel tested and passed
|
FIR14-00775
| INSP-Sprinkler Rough-in | 10/30/2014 | 10/31/2014 | 10/31/2014 2:25:57 PM | P | PART |
|
|
ths was for hard lips in NW area of shop. pass
|
NAF14-00006
| INSP-Sprinkler Rough-in/Hydro | 10/30/2014 | 10/31/2014 | 10/31/2014 2:11:25 PM | P | FAIL |
|
|
heads need to installed in fireplace chase's. head needs installed in new room 1st floor S unit. As builts need to be submitted. Re-hydro after instilation of heads.
|
FIR14-00470
| INSP-Sprinkler Rough-in/Hydro | 10/30/2014 | 10/31/2014 | 10/31/2014 2:10:55 PM | P | FAIL |
|
|
heads need to installed in fireplace chase's. head needs installed in new room 1st floor S unit. As builts need to be submitted. Re-hydro after instilation of heads.
|
FIR14-00783
| INSP-Sprinkler Rough-in | 10/31/2014 | 10/31/2014 | 10/31/2014 11:34:38 AM | P | PASS |
|
|
underground stub
|
FIR14-00604
| INSP-Sprinkler Rough-in | 10/30/2014 | 10/31/2014 | 10/31/2014 10:44:41 AM | A | PART |
|
|
3rd floor dry system rough in inspected and pass with as builts. 3rd floor wet system corections inspected and pass. CDH
|
BLD14-00613
| FIRE-Final Inspection | 10/30/2014 | 10/31/2014 | 10/31/2014 10:41:51 AM | P | PART |
|
|
1.Exit sign on main door needs to be installed. 2. bug eyes need added in back hallway by restrooms 3. verbal verification of smoke detector in HVAC units working.
|