Inspections for the day of: Friday, October 31, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-00038 BLD-Framing/Rough-in10/30/201410/31/201410/31/2014 3:42:08 PMPPASS
Final phase framing inspection. Phone #: ###-#### Inspection requested via web by Chris Jackson. existing nurses station addition, window infill and removal of portion interior non load bearing wall.
BLD14-03141 BLD-Conference10/31/201410/31/201410/31/2014 3:02:48 PMPFAIL
floor plan does not match. interior walls and enclosure built with no permits, also posiible electrical work done with no permits. A building permit wil be required.
BLD14-01482 BLD-Wall Bracing10/31/201410/31/201410/31/2014 2:21:42 PMPPASS
Shear fastening in sheetrock interior shear walls Phone #: ###-#### Inspection requested via web by Brian Stark
BLD14-01496 BLD-Final10/31/201410/31/201410/31/2014 2:21:29 PMPCANC
tom Phone #: ###-####
BLD14-01496 BLD-Framing/Rough-in10/31/201410/31/201410/31/2014 2:21:19 PMPPASS
tom Phone #: ###-####. west half roof ok to coveer.
BLD13-03531 BLD-Footing10/30/201410/31/201410/31/2014 11:28:57 AMAPASS
Flat work footings Phone #: ###-#### Inspection requested via web by James Larkin. interior thickend footings.
BLD13-03530 BLD-Footing10/30/201410/31/201410/31/2014 11:28:35 AMAPASS
Flat work footings Phone #: ###-#### Inspection requested via web by James Larkin. interior thickend footings.
BLD13-03529 BLD-Footing10/30/201410/31/201410/31/2014 11:28:06 AMAPASS
Flat work footings Phone #: ###-#### Inspection requested via web by James Larkin. interior thickend footings.
BLD13-03528 BLD-Footing10/30/201410/31/201410/31/2014 11:20:06 AMAPASS
Flat work footing Phone #: ###-#### Inspection requested via web by James Larkin. interior thickend footings.
BLD14-03002 BLD-Framing/Rough-in10/30/201410/31/201410/31/2014 10:01:15 AMAPART
Partial framing for floor - Mike Phone #: ###-####. floor framing ok. Needs to provide vapor barrier on concrete slab.
BLD14-03029 BLD-Footing10/30/201410/31/201410/31/2014 9:26:14 AMAPART
Jeff Phone #: ###-####
BLD14-03141 BLD-Conference10/30/201410/31/201410/31/2014 8:59:11 AMANH
Cindy Phone #: ###-####. No access, no one there, doors locked.