ESC16-00556
| General Inspection | 10/27/2016 | 10/31/2016 | 11/3/2016 8:58:13 AM | A | CANC |
|
|
rescheduled
|
ESC16-00319
| General Inspection | 10/27/2016 | 10/31/2016 | 11/2/2016 8:03:39 AM | P | CANC |
|
|
|
ESC15-00857
| General Inspection | 10/31/2016 | 10/31/2016 | 11/2/2016 8:03:13 AM | | CANC |
|
|
rescheduled
|
ESC15-00541
| General Inspection | 10/31/2016 | 10/31/2016 | 11/2/2016 8:02:39 AM | | CANC |
|
|
|
ESC15-01569
| Aging Inspection | 10/31/2016 | 10/31/2016 | 11/1/2016 12:19:41 PM | | PASS |
|
|
WIP. Staging in alley. No trackout or muddy runoff issues observed. No trash or loose material onsite.
|
ESC16-00945
| General Inspection | 10/28/2016 | 10/31/2016 | 11/1/2016 12:14:30 PM | A | PEND |
|
|
request new construction entrance.
RP to block entrance access and keeep equipment on site until the new stabilized entrance can be connected Warm Springs on west side of site. No significant trackout at time of inspection. RP to notify when new entrance is installed. Silt fence perimeter in good condition.
No other corrections requested.
|
ESC15-01224
| General Inspection | 10/31/2016 | 10/31/2016 | 11/1/2016 11:45:47 AM | | CANC |
|
|
|
ESC15-00556
| General Inspection | 10/28/2016 | 10/31/2016 | 11/1/2016 11:40:23 AM | P | PASS |
|
|
No erosion on subdivison slopes observed, no trackout from open areas. All new storm drains have inlet protection. Earthen berms constructed in new phase open lots to control/contain sheet flow runoff. Tahoe Homes has constructed new lined concrete washout. Approved.
|
ESC16-00101
| Aging Inspection | 10/31/2016 | 10/31/2016 | 11/1/2016 8:03:47 AM | | CANC |
|
|
|
ESC15-00957
| General Inspection | 10/31/2016 | 10/31/2016 | 11/1/2016 8:03:35 AM | | CANC |
|
|
|
ESC15-01296
| Aging Inspection | 10/31/2016 | 10/31/2016 | 11/1/2016 8:03:22 AM | | PASS |
|
|
|
ESC16-01182
| Site Preparation | 10/31/2016 | 10/31/2016 | 10/31/2016 3:14:53 PM | P | PASS |
|
|
Clint Phone #: ###-####
Subdivision BMPs installed. Approved for construction
|
ESC16-01128
| Site Preparation | 10/31/2016 | 10/31/2016 | 10/31/2016 3:14:39 PM | P | PASS |
|
|
Clint Phone #: ###-####
Subdivision BMPs installed. Approved for construction
|
ESC15-01248
| General Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 3:07:42 PM | | PASS |
|
|
WIP on interior TI. No disturbed area or material stockpiling occuring in street or alley. No discharges or other issues. Approved.
|
ESC15-01206
| General Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 3:07:01 PM | | PASS |
|
|
Activity now covered under ESC15-01248
|
ESC15-01206
| DOC - Permit Finaled | 10/31/2016 | 10/31/2016 | 10/31/2016 3:06:37 PM | P | PASS |
|
|
|
ESC15-01218
| Aging Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 2:28:58 PM | | PASS |
|
|
WIP on frame. No spills, discharges or muddy runoff from site. No corrections requested. Approved.
|
ESC16-00871
| Site Preparation | 10/31/2016 | 10/31/2016 | 10/31/2016 2:05:43 PM | P | PASS |
|
|
Phone #: ###-#### Todd
Re-isnpection after Failed Inspections.
Re-inspection fee assessed to permit holder ( 4 failed/partial inspections in a row)
Trash and materials now picked up and removed from site. Sediment control wattles re-installed and dirt around inlet filter mat was swept & removed.
New contact for this project is Todd.
|
ESC04-00704
| DOC - Permit Finaled | 10/31/2016 | 10/31/2016 | 10/31/2016 1:46:48 PM | P | PASS |
|
|
old expired permit in database removed
|
ESC04-00818
| DOC - Permit Finaled | 10/31/2016 | 10/31/2016 | 10/31/2016 1:46:38 PM | P | PASS |
|
|
old expired permit in database removed
|
ESC04-00398
| DOC - Permit Finaled | 10/31/2016 | 10/31/2016 | 10/31/2016 1:46:27 PM | P | PASS |
|
|
old expired permit in database removed
|
ESC04-01528
| DOC - Permit Finaled | 10/31/2016 | 10/31/2016 | 10/31/2016 1:46:19 PM | P | PASS |
|
|
expired permit in database removed
|
ESC04-01450
| DOC - Permit Finaled | 10/31/2016 | 10/31/2016 | 10/31/2016 1:45:50 PM | P | PASS |
|
|
old expired permit
|
ESC15-00977
| Aging Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 1:36:46 PM | | PASS |
|
|
|
ESC16-00455
| Site Final | 10/31/2016 | 10/31/2016 | 10/31/2016 11:52:03 AM | P | PASS |
|
|
Constrction complete. Disturbed area stabilized. Temporary BMPs (inlet bags) have been removed; no loose materials remaining on site. ESC permit conditions satisfied.
|
ESC16-01246
| Site Preparation | 10/31/2016 | 10/31/2016 | 10/31/2016 11:28:11 AM | A | PART |
|
|
Note: Site prep conducted under BLD permit inspection activity BLD16-02588.
Perimeter BMPs installed, permit sign posted.
Verbal Correction request: - sweep trackout between staging lot and building lot - conduct maintenance on DI filter mat
Compliance followup scheduled 11/2
|
ESC16-00865
| Site Preparation | 10/31/2016 | 10/31/2016 | 10/31/2016 11:25:29 AM | P | CANC |
|
|
Jeff Phone #: ###-####
phone conference conductted. Site prep scheduled for Wed 11/2 PM
|
ESC16-00865
| Conference | 10/31/2016 | 10/31/2016 | 10/31/2016 11:24:30 AM | A | PASS |
|
|
phone conference with RP Jeff. ###-#### ACHD staging yard work approved to begin removing stock piles tomorrow AM. Site preparation walk through to be conducted on Wednesday.
RP familiar with ESC conditions. Permit sign to be posted with SWPPP info.
|
ESC15-00862
| General Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 11:09:49 AM | | PASS |
|
|
BLD now finaled and landscaping installed. Rear hillside vegtation not yet established. No sediment runoff or issues on Orion. Will keep open for monitoring hillside.
|
ESC15-01256
| General Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 10:33:00 AM | | PART |
|
|
Need to repair access road for equipment in backyard from Sand Dune. BLD finaled, will final up repair and re-installation of BMPs behind homes on Painted Rock.
|
ESC13-00193
| General Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 10:31:40 AM | | PART |
|
|
No SFH activity on culdesca. Perimeter sediment controls and vegetation established on banks prevent significant sediment runoff.
Correction request to RP and Shane Jayo: - road to access backyards on Painted Rock should be hydroseeded and sediment controls re-installed
|
ESC15-01210
| General Inspection | 10/31/2016 | 10/31/2016 | 10/31/2016 10:10:40 AM | A | PASS |
|
|
Post rainfall inspection.
No sediment runoff evident from site. Sediment control wattles and hydoseed/tacifie application has worked well prevent erosion.
No recent activity. No SFH construction yet.
Approved
|