ESC19-00574
| General Inspection | 10/24/2019 | 10/31/2019 | 11/4/2019 4:02:58 PM | P | PART |
|
|
follow up inspection
New washout was provided, but it is now about 75% full. No extension of construction entrance for Lander access.
Appears crews are prepping to open the access on VMP. Will install trackout pad in this location. Dewatering pump was not on at time of inspection.
|
ESC18-01451
| General Inspection | 10/31/2019 | 10/31/2019 | 11/1/2019 8:43:56 AM | | CANC |
|
|
|
ESC18-01651
| Aging Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 8:16:11 AM | | CANC |
|
|
rescheduled for site final
|
ESC19-00072
| General Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 8:15:00 AM | | CANC |
|
|
See ESC18-01767 for coverage.
|
ESC19-00072
| DOC - Permit Finaled | 10/31/2019 | 10/31/2019 | 10/31/2019 8:13:42 AM | P | PASS |
|
|
|
ESC18-01626
| Aging Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 8:12:46 AM | | CANC |
|
|
rescheduled for site final
|