BLD00-02375
| BLD-Concrete | 10/3/2000 | 10/4/2000 | 10/4/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/03/2000 at 13:50:01. Contact: ###-####. sub basement ft and rebar ok for placement. north/east exterior wall lines. pending mti special inspection report. 10/4/2000 9:34:22 AM
|
BLD98-01409
| BLD-Conference | 10/3/2000 | 10/4/2000 | 10/4/2000 12:00:00 AM | A | PART |
|
|
Wants Jim Story to take the inspection per George Slane Mike Mason ###-#### pending resubmital from arch. to address 2 hr. assembly. 10/4/2000 1:37:25 PM
|
BLD99-02805
| BLD-Energy code compliance | 10/4/2000 | 10/4/2000 | 10/4/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 07:40:26. Contact: ###-####. ok for cover. 10/4/2000 2:04:15 PM
|
MEC00-03371
| Pressure Test | 10/4/2000 | 10/4/2000 | 10/4/2000 12:00:00 AM | P | PASS |
|
|
pres test-- randy ###-#### cell cert. by gas co. 10/4/2000 9:55:20 AM
|
BLD00-02328
| BLD-Final | 10/3/2000 | 10/4/2000 | 10/4/2000 12:00:00 AM | P | PASS |
|
|
keith ###-#### l/c ok. 10/4/2000 4:30:09 PM
|
BLD00-01563
| BLD-Concrete | 10/2/2000 | 10/4/2000 | 10/4/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 07:04:02. Contact: ###-####. placed w/special insp. pending report. 10/4/2000 1:38:05 PM
|