BLD02-01618
| BLD-Final | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | A | CANC |
|
|
gale call first ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
MEC02-02785
| Rough-in | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-02785
| Pressure Test | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-01794
| BLD-Final | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/03/2002 at 17:18:57. Contact: ###-####.ok perm oc. 10/4/2002 12:40:22 PM
|
BLD02-01959
| BLD-Final | 10/4/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | NR |
|
|
###-#### call first to meet there
|
BLD02-01720
| BLD-Final | 10/4/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | PART |
|
|
ok temp oc , c/n handrail step riser. 10/4/2002 1:49:33 PM
|
MEC02-02033
| Final | 10/4/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | FAIL |
|
|
c/n posted. 10/4/2002 2:06:39 PM
|
BLD02-01477
| BLD-Framing/Rough-in | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | CANC |
|
|
|
BLD02-01720
| FIRE-Final Inspection | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD02-02140
| BLD-Final | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | FAIL |
|
|
FN INSP- ###-#### BRIAN . Smoke detectors required as per section 310.9.1.2.1997 ubc. As I hade told builder via phone call at last time he called for inspection. 10/4/2002 2:24:07 PM
|
BLD02-01208
| BLD-Final | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | FAIL |
|
|
###-####c/n posted. 10/4/2002 2:06:29 PM
|