BLD02-00579
| FIRE-Final Inspection | 10/3/2002 | 10/4/2002 | 10/5/2002 12:00:00 AM | A | PASS |
|
|
|
BLD02-00938
| FIRE-Final Inspection | 10/3/2002 | 10/4/2002 | 10/5/2002 12:00:00 AM | A | PASS |
|
|
|
FIR02-00130
| INSP-Final Inspection | 10/4/2002 | 10/4/2002 | 10/4/2002 10:41:32 AM | A | CANC |
|
|
Jonathon lee foreman on site. Clean room and fan attic.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
BLD02-00453
| FIRE-Sprinkler Rough-in | 10/4/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | A | PASS |
|
|
okay to cover
|
FIR02-00340
| INSP-Sprinkler Rough-in/Hydro | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie tenting not wide enough nor secure in all areas where plastic is used for tenting; need nail plates where pipe is vertical in stud cavities 10/4/2002 1:49:02 PM
|
FIR02-00363
| INSP-Sprinkler Rough-in | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | A | PART |
|
|
###-#### okay to cover; riser not complete; sidewalls not installed in garage 10/4/2002 10:03:17 AM
|
BLD01-02848
| FIRE-Final Inspection | 10/3/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | FAIL |
|
|
###-#### LES fire stop new shower water line in chem room; EQ main sprinkler riser 10/4/2002 4:53:45 PM
|
FIR02-00123
| INSP-Sprinkler Rough-in/Hydro | 10/4/2002 | 10/4/2002 | 10/4/2002 12:00:00 AM | P | PART |
|
|
re-test on dry line: wet and dry re-charged to 200+; Phone #: ###-#### Internet Inspection Request from: Trent Bice hydro okay on overhead systems 10/4/2002 4:54:07 PM
|
BLD02-00176
| FIRE-Final Inspection | 10/3/2002 | 10/4/2002 | 10/3/2002 12:00:00 AM | A | PASS |
|
|
sherly ###-####
|
MIS02-00241
| FIR-Final | 10/3/2002 | 10/4/2002 | 10/3/2002 12:00:00 AM | P | PASS |
|
|
###-####
|