FIR04-00465
| INSP-Final Inspection | 10/1/2004 | 10/4/2004 | 10/4/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/1/2004 at 11:52:50 AM. Contact: ###-####.
|
FIR04-00465
| INSP-Final Inspection | 10/4/2004 | 10/4/2004 | 10/4/2004 12:00:00 AM | A | PASS |
|
|
|
FIR02-00005
| INSP-Sprinkler Rough-in/Hydro | 10/4/2004 | 10/4/2004 | 10/4/2004 12:00:00 AM | P | DONE |
|
|
Start 24 hour test 12 pm with 43 psi on dry system under old walkway 10/4/2004 1:37:18 PM
|