MEC06-02224
| Conference | 10/3/2006 | 10/4/2006 | 10/5/2006 8:57:40 AM | A | PEND |
|
|
mke ###-#### dix call mike to set up a time for a conference to figure whos doing what on this job. the building out back mec06-02225 was called in but never passed. you should go over that one with him also...spoke with mike, his scope of work only included the gas line and ductwork in basement. i later spoke with the home-owner and told him why i had put a stop work on the job. he needs to go to the city and get a heating permit for the furnace, ductwork, w/h, range vent, etc. he also needs to update his elec permit to include the rest of the fixtures as the 1st permit only covered a 200 amp service. he will call all the inspectors and schedule a conference to discuss the changes. his g/c walked off the job due to money issues a few months ago. i called dave hannah and let him know what was going on
|
MEC06-01833
| Final | 10/3/2006 | 10/4/2006 | 10/4/2006 7:40:10 PM | A | PASS |
|
|
Dixie the vent termination for the range was at the back of the house, and there is no upper furnace for this home.Let me know if you have any questions. Thank you Rhiannon ; Phone #: ###-#### x222 Internet Inspection Request from: Rhiannon Stuck
|
MEC06-02937
| Rough-in | 10/4/2006 | 10/4/2006 | 10/4/2006 5:47:00 PM | P | NR |
|
|
jamie; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..CALLED CONTRACTOR. I NEED INSTALLER TO MEET ME ON THIS JOB..NEEDS TO SHOW ME LOCATION OF NEW DUCTWORK, ETC
|
MEC06-03269
| Final | 10/4/2006 | 10/4/2006 | 10/4/2006 4:51:53 PM | P | NH |
|
|
gilbert ; Phone #: ###-#### -call before going Internet Inspection Request from: Patricia Smith..TRIED CALLING CELL PHONE..NO ANSWER..LEFT NOTICE ON DOOR
|
MEC06-02754
| Rough-in | 10/3/2006 | 10/4/2006 | 10/4/2006 2:50:37 PM | P | PEND |
|
|
On site Cable @ ###-####; J591; Phone #: ###-#### Internet Inspection Request from: Dixie Miyake..CONTRACTOR NEED TO ATTACH THIS PERMIT TO THE BUILDING PERMIT ASSIGNED TO THIS JOB
|
MEC06-02573
| Conference | 10/3/2006 | 10/4/2006 | 10/4/2006 1:21:30 PM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Patricia Smith...MET WITH MECH CONTRACTOR AND DISCUSSED CORRECTION NOTICE
|
MEC05-03605
| Final | 10/3/2006 | 10/4/2006 | 10/4/2006 12:45:58 PM | A | FAIL |
|
|
MEET WADE AT 10:30..NEED MANUF SPECS FOR BOILER THAT HAS THE ACTUAL MODEL # ON IT TO MATCH THE BOILER ON JOB..COMPLETE RANGE EXHAUST..NEED DRAIN PAN UNDER FURNACE IN ATTIC
|
MEC06-02804
| Pressure Test | 10/4/2006 | 10/4/2006 | 10/4/2006 12:43:01 PM | P | PASS |
|
|
20LB TEST OK
|