PLM07-01562
| Med/Gas Systems | 10/3/2007 | 10/4/2007 | 10/4/2007 3:58:03 PM | A | PART |
|
|
Colin Libby is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet 24 hr pressure test start on run,s on west side note DWV on west side test ok still need to run water lines
|
PLM07-03260
| Groundwork | 10/4/2007 | 10/4/2007 | 10/4/2007 3:20:24 PM | P | PASS |
|
|
water test on grease interceptor test ok
|
PLM07-02355
| Groundwork | 10/4/2007 | 10/4/2007 | 10/4/2007 3:02:13 PM | P | PART |
|
|
josh Phone #: ###-#### last set of case drain,s test ok
|
PLM07-03363
| Groundwork | 10/4/2007 | 10/4/2007 | 10/4/2007 2:39:18 PM | P | PASS |
|
|
door is open call with questions Phone #: ###-#### Internet Inspection Request from: Kirk Johns
|
PLM07-03317
| Plumbing Rough-in | 10/4/2007 | 10/4/2007 | 10/4/2007 2:07:02 PM | P | PASS |
|
|
joe Phone #: ###-####
|
PLM07-01562
| Plumbing Rough-in | 10/3/2007 | 10/4/2007 | 10/4/2007 10:53:53 AM | A | PART |
|
|
Colin Libby is the field contact Phone #: ###-#### Internet Inspection Request from: Heidi Mallet roof and over flow drain,s on east side of building test ok DWV on east side second floor test ok still working on water
|