Inspections for the day of: Thursday, October 4, 2007.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00316 INSP-Final Inspection10/1/200710/4/200710/5/2007 10:37:18 AMPCANC
bill Phone #: ###-#### Incorrect permit number called in, was intended for the project related fire alarm permit.
FIR07-00619 INSP-Final Inspection10/4/200710/4/200710/5/2007 10:35:11 AMPFAIL
Added upright heads will need to be shown on approved resubmittals including revised hydraulic calculations, also need to provide coverage below the overhead doors, forward flow has not been completed, insulation at the deck is not finished at some areas, may need high temp heads above unit heaters.
FIR07-00765 INSP-Sprinkler Rough-in/Hydro10/3/200710/4/200710/5/2007 10:31:03 AMPFAIL
Approved plans were not available on site, install appears satisfactory, however will need plans for verification.
FIR07-00728 INSP-Sprinkler Rough-in10/3/200710/4/200710/5/2007 10:29:34 AMPPART
OH install is good for cover at the drop ceilings, one head at the warehouse restroom is covered, the SW head at the overhead door in not required due to door configuration, final pending ceiling tile and escutcheons.
FIR07-00425 INSP-Sprinkler Rough-in/Hydro10/4/200710/4/200710/4/2007 3:57:02 PMPPART
1st and 2nd floor hydrostatic tests passed, OH install is okay for cover at the 3rd floor, no cover allowed on the 4th floor until DSW heads are in place.
BLD07-00922 FIRE-Final Inspection10/3/200710/4/200710/4/2007 2:57:23 PMPFAIL
Need to add EM lighting per plan including the exit discharge, post max. occupant load signs as discussed, provide one PFE for the basement level, clear the area blocking access to the basement exit door, need to tag the fire extinguishers with current certification.
FIR07-00763 INSP-Final Inspection10/4/200710/4/200710/4/2007 1:47:15 PMPPASS
Fire sprinkler work passed inspection, permit finaled.
BLD07-01051 FIRE-Final Inspection10/4/200710/4/200710/4/2007 1:02:03 PMPCANC
Overbooked
FIR06-00007 INSP-Final Inspection10/3/200710/4/200710/4/2007 12:34:16 PMAPART
See plans for areas tested on the second floor, noted items in need of correction, HD at the elevator machine room tested okay.
FIR07-00755 INSP-Sprinkler Rough-in/Hydro10/3/200710/4/200710/4/2007 10:58:06 AMAPART
Added heads below ductwork are acceptable, okay for cover at the drop ceilings, begin pneumatic testing @ 40psi at 10:15 AM for the preaction system.
FIR07-00320 FIR-Aging Inspection10/4/200710/4/200710/4/2007 10:24:35 AM DEFR
wip
BLD07-01762 FIRE-Final Inspection10/3/200710/4/200710/4/2007 10:24:08 AMAPASS
Fire life safety passed.
FIR07-00348 INSP-Final Inspection10/4/200710/4/200710/4/2007 10:21:50 AMPPASS
Fire sprinkler permit finaled.
FIR07-00765 INSP-Sprinkler Rough-in10/3/200710/4/200710/3/2007 11:36:28 AMPCANC
OH cover Inspection Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
FIR07-00728 INSP-Sprinkler Rough-in10/3/200710/4/200710/3/2007 11:36:06 AMPCANC
OH Cover Inspection Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley