PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, October 4, 2010
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00791
General Inspection ESC
10/4/2010
10/4/2010
10/5/2010 8:26:38 AM
PASS
ESC10-00754
BMP Violation
10/1/2010
10/4/2010
10/4/2010 8:45:13 PM
A
FAIL
Correction Notice:
1. Replace sediment barrier at the front perimeter of the project lot. Failure to comply will result in further enforcement. Will re-inspect on 10/5/2010 PM.
ESC10-00552
BMP Violation
9/30/2010
10/4/2010
10/4/2010 4:19:10 PM
A
FAIL
Correction NOtice:
1. Re-install the sediment barrier at the front of lot.
2. Post ESC sign where visable from the street.
**Failure to comply will result in a stop work order. Will re-inspect on 10/5/2010Pm.
ESC10-00693
Site Preparation
10/4/2010
10/4/2010
10/4/2010 3:43:06 PM
PASS
ESC10-00740
BMP Violation
10/1/2010
10/4/2010
10/4/2010 3:31:06 PM
A
CANC
ESC10-00741
BMP Violation
10/1/2010
10/4/2010
10/4/2010 3:12:38 PM
P
FAIL
Correction Notice:
1.Replace the ramp with non-erodible material.
2. At end of each work day, install a sediment barrier at back of sidewalk at the acccess.
**Failure to comply will result in a stop work order. Will re-inspect on 10/5/10PM.
ESC10-00040
General Inspection
9/28/2010
10/4/2010
10/4/2010 1:35:56 PM
A
PART
Verbal to RP:
Place weighted non erodible materal on top of the wattle and gator guard that are placed on the hard surfaces. Sweep all hard surfaces within the project area where thereare any sediment deposits. Install a stabilized construction exit with deliniators at the exit of project area by the job trailer. Will re-inspect 10/6/10PM.
ESC10-00672
BMP Violation
10/1/2010
10/4/2010
10/4/2010 9:38:42 AM
A
FAIL
Spoke with RP and was told that all grades over 2% will be protected this morning. Will follow-up on 10/5/2010am.
ESC10-00672
Site Preparation
10/4/2010
10/4/2010
10/4/2010 9:36:07 AM
CANC
Refer to BMP Violation inspection.
ESC10-00679
Site Preparation
10/4/2010
10/4/2010
10/4/2010 9:35:18 AM
PASS
ESC10-00678
Site Preparation
10/4/2010
10/4/2010
10/4/2010 9:34:13 AM
PASS
ESC10-00675
Site Preparation
10/4/2010
10/4/2010
10/4/2010 9:34:00 AM
PASS
ESC09-00507
BMP Violation
9/24/2010
10/4/2010
10/4/2010 9:16:46 AM
A
PASS