FIR08-00378
| FIR-Aging Inspection | 10/4/2011 | 10/4/2011 | 10/6/2011 8:41:54 AM | | NR |
|
|
I forwarded this permit number and status to scott for further action.
|
FIR09-00051
| FIR-Aging Inspection | 10/4/2011 | 10/4/2011 | 10/6/2011 8:40:57 AM | | NR |
|
|
I forwarded this permit number and status to scott for further action.
|
FIR11-00277
| INSP-Alarm Testing | 10/4/2011 | 10/4/2011 | 10/4/2011 3:29:50 PM | P | FAIL |
|
|
Provide as-builts showing the wiring schematic for the PAM-2 relay that has been added to provide an alarm output to the AES. Also provide a data sheet for the PAM-2 relay. Permit can be finaled when this documentation has been provided.
|
FIR11-00274
| INSP-Alarm Testing | 10/4/2011 | 10/4/2011 | 10/4/2011 3:28:58 PM | P | FAIL |
|
|
Provide as-builts showing the wiring schematic for the PAM-2 relay that has been added to provide an alarm output to the AES. Also provide a data sheet for the PAM-2 relay. Permit can be finaled when this documentation has been provided.
|
FIR11-00276
| INSP-Alarm Testing | 10/4/2011 | 10/4/2011 | 10/4/2011 3:27:58 PM | P | FAIL |
|
|
Provide as-builts showing the wiring schematic for the PAM-2 relay that has been added to provide an alarm output to the AES. Also provide a data sheet for the PAM-2 relay. Permit can be finaled when this documentation has been provided.
|
FIR11-00453
| INSP-Alarm Testing | 10/4/2011 | 10/4/2011 | 10/4/2011 3:26:55 PM | P | FAIL |
|
|
Provide as-builts showing the wiring schematic for the PAM-2 relay that has been added to provide an alarm output to the AES. Also provide a data sheet for the PAM-2 relay. Permit can be finaled when this documentation has been provided.
|
FIR11-00279
| INSP-Alarm Testing | 10/4/2011 | 10/4/2011 | 10/4/2011 3:26:14 PM | P | FAIL |
|
|
Provide as-builts showing the wiring schematic for the PAM-2 relay that has been added to provide an alarm output to the AES. Also provide a data sheet for the PAM-2 relay. Permit can be finaled when this documentation has been provided.
|
FIR11-00275
| INSP-Alarm Testing | 10/4/2011 | 10/4/2011 | 10/4/2011 3:25:08 PM | P | FAIL |
|
|
Provide as-builts showing the wiring schematic for the PAM-2 relay that has been added to provide an alarm output to the AES. Also provide a data sheet for the PAM-2 relay. Permit can be finaled when this documentation has been provided.
|
FIR11-00278
| INSP-Alarm Testing | 10/4/2011 | 10/4/2011 | 10/4/2011 3:24:32 PM | P | FAIL |
|
|
Provide as-builts showing the wiring schematic for the PAM-2 relay that has been added to provide an alarm output to the AES. Also provide a data sheet for the PAM-2 relay. Permit can be finaled when this documentation has been provided.
|
BLD11-02301
| FIRE-Final Inspection | 10/3/2011 | 10/4/2011 | 10/4/2011 3:20:59 PM | P | FAIL |
|
|
Provide sticker at the main exit, provide single action hardware at the rear exit and provide annual inspection tag for the fire extinguisher.
|
BLD10-02931
| FIRE-Final Inspection | 10/4/2011 | 10/4/2011 | 10/4/2011 1:38:55 PM | P | PASS |
|
|
life safety passed
|
BLD09-00832
| FIRE-Final Inspection | 10/4/2011 | 10/4/2011 | 10/4/2011 1:38:40 PM | P | PASS |
|
|
life safety passed
|
BLD11-00346
| FIRE-Final Inspection | 10/3/2011 | 10/4/2011 | 10/4/2011 1:38:07 PM | A | FAIL |
|
|
Remove the thumbturn dead bolt and round door knob and provide single action hardware on the shop area exterior exit door. Provide single action hardware on the two office doors. Provide self illuminated exit signs as marked on the city approved plans. Mount the fire extinguishers as discussed. Emergency lighting is not required per Carl Madsen.
|
FIR11-00095
| INSP-Final Inspection | 10/3/2011 | 10/4/2011 | 10/4/2011 1:21:44 PM | A | CANC |
|
|
Cancel per Stephan Phone #: ###-####
|
FIR11-00464
| INSP-Sprinkler Rough-in | 10/3/2011 | 10/4/2011 | 10/4/2011 12:26:51 PM | A | PASS |
|
|
The piping above the hardlids is ok to cover
|
BLD11-02132
| FIRE-Final Inspection | 10/4/2011 | 10/4/2011 | 10/4/2011 10:31:49 AM | P | PASS |
|
|
life safety passed
|
BLD11-02144
| FIRE-Final Inspection | 10/3/2011 | 10/4/2011 | 10/4/2011 10:30:45 AM | A | PASS |
|
|
life safety passed
|
FIR10-00562
| INSP-Final Inspection | 10/4/2011 | 10/4/2011 | 10/4/2011 10:30:06 AM | P | PASS |
|
|
Permit finaled
|
FIR11-00436
| INSP-Sprinkler Rough-in | 10/3/2011 | 10/4/2011 | 10/4/2011 9:00:27 AM | A | PASS |
|
|
The sprinkler piping in the "lab" room is ok to cover. The plywood sheating that is attached to the roof deck is fire treated. Yesterdays entry to provide upright protection is null and void.
|
BLD11-01959
| FIRE-Final Inspection | 10/3/2011 | 10/4/2011 | 10/4/2011 8:29:09 AM | A | PASS |
|
|
life safety passed
|
FIR11-00495
| INSP-Final Inspection | 10/4/2011 | 10/4/2011 | 10/4/2011 8:28:53 AM | A | PASS |
|
|
permit finaled
|
BLD11-01989
| FIRE-Final Inspection | 10/3/2011 | 10/4/2011 | 10/4/2011 8:28:37 AM | A | FAIL |
|
|
The city approved plans show addtional exit signs that have not been installed. I discussed emergency lighting requirements for the same areas where plan review showed the new exit signs. Will need to verify panic hardware and fire extinguishers as well at next inspection.
|
BLD11-01888
| FIRE-Final Inspection | 10/3/2011 | 10/4/2011 | 10/4/2011 8:19:50 AM | A | CANC |
|
|
life safety passed
|
FIR11-00382
| INSP-Alarm Testing | 9/29/2011 | 10/4/2011 | 10/4/2011 12:00:00 AM | P | CANC |
|
|
rafe Phone #: ###-####
|