FIR12-00163
| FIR-Aging Inspection | 10/4/2012 | 10/4/2012 | 10/10/2012 2:44:41 PM | | NR |
|
|
Jeff is following up on status.
|
FIR12-00106
| FIR-Aging Inspection | 10/4/2012 | 10/4/2012 | 10/10/2012 2:44:12 PM | | NR |
|
|
Jeff is following up on status.
|
FIR12-00548
| INSP-Sprinkler Rough-in | 10/3/2012 | 10/4/2012 | 10/4/2012 3:29:32 PM | P | PASS |
|
|
Sprinkler rough-in passed
|
FIR12-00066
| INSP-Final Inspection | 9/25/2012 | 10/4/2012 | 10/4/2012 2:59:52 PM | A | FAIL |
|
|
Provide map at the facp
|
FIR12-00203
| INSP-Final Inspection | 10/2/2012 | 10/4/2012 | 10/4/2012 2:58:03 PM | A | PASS |
|
|
Permit finaled
|
BLD12-02542
| FIRE-Final Inspection | 10/3/2012 | 10/4/2012 | 10/4/2012 11:17:57 AM | A | PASS |
|
|
life safety passed
|
FIR12-00075
| FIR-Aging Inspection | 10/4/2012 | 10/4/2012 | 10/4/2012 10:36:04 AM | | NR |
|
|
Steve is going to have this scheduled
|
FIR12-00064
| INSP-Final Inspection | 9/25/2012 | 10/4/2012 | 10/4/2012 10:14:08 AM | A | FAIL |
|
|
Provide plan modification showing the correct model number of the DSC panel that has been installed and provide map at the facp.
|
FIR12-00088
| INSP-Final Inspection | 9/25/2012 | 10/4/2012 | 10/4/2012 10:13:24 AM | A | FAIL |
|
|
Provide plan modification showing the correct model number of the DSC panel that has been installed and provide map at the facp.
|
FIR12-00033
| INSP-Alarm Testing | 10/2/2012 | 10/4/2012 | 10/4/2012 8:08:04 AM | A | PART |
|
|
See the city approved plans for locations tested today. Plan modifications are required as per red line comments since only one of the remote power supplies is a Potter brand. When resubmitting provide new address labels, strobe candellas and device locations.
|
BLD12-00846
| FIRE-Final Inspection | 10/1/2012 | 10/4/2012 | 10/4/2012 12:00:00 AM | P | CANC |
|
|
Jaylee Phone #: ###-####
|