MEC12-03948
| Rough-in | 10/3/2013 | 10/4/2013 | 10/7/2013 8:21:39 AM | A | PASS |
|
|
1st Floor grease duct light test Phone #: ###-#### >> Inspection requested via web by Allison Briggs grease duct for the fork
|
MEC13-04000
| Rough-in | 10/3/2013 | 10/4/2013 | 10/4/2013 3:46:02 PM | P | PASS |
|
|
Ready after noon Phone #: ###-#### >> Inspection requested via web by Russ Curtis 20# gas test
|
MEC13-04040
| Final | 10/3/2013 | 10/4/2013 | 10/4/2013 3:23:43 PM | P | PASS |
|
|
>> Inspection requested via web by Don Dowers
|
MEC13-02475
| Final | 10/3/2013 | 10/4/2013 | 10/4/2013 2:58:46 PM | P | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Troy Worley need air balance report for each furnace and need to complete air intake installations per page 24 of installation manual
|
MEC13-03521
| Pressure Test | 10/3/2013 | 10/4/2013 | 10/4/2013 2:25:12 PM | P | PASS |
|
|
CONTACT IS BRIAN HUFFMAN ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS test to fireplace ok, need to hard pipe into firebox and make sure valve is accessable in firebox.
|
MEC13-00287
| Pressure Test | 10/3/2013 | 10/4/2013 | 10/4/2013 1:57:09 PM | A | PASS |
|
|
CONTACT IS COLIN ###-#### Phone #: ###-#### >> Inspection requested via web by LENNIE BUSS ok pressure test to heating pipes
|
MEC13-03708
| Rough-in | 10/3/2013 | 10/4/2013 | 10/4/2013 11:19:08 AM | A | PASS |
|
|
Ceiling Cover Please. Call Matt Hines with any questions ###-#### Phone #: ###-#### >> Inspection requested via web by Sarah Rhodes ok ceiling cover except at break room, need to inspect hydronics and condensate
|
MEC13-03033
| Final | 10/2/2013 | 10/4/2013 | 10/4/2013 10:50:44 AM | A | CANC |
|
|
final schedule Phone #: ###-#### >> Inspection requested via web by Lisa Whitney cannot final at this time
|
MEC13-03033
| Rough-in | 10/4/2013 | 10/4/2013 | 10/4/2013 10:50:19 AM | A | PASS |
|
|
final schedule Phone #: ###-#### >> Inspection requested via web by Lisa Whitney 20# test for duplex and rough ok, duct blast test ok
|
MEC13-04034
| Final | 10/3/2013 | 10/4/2013 | 10/4/2013 10:24:45 AM | A | FAIL |
|
|
TENANT HOME UNTIL 11:00 A.M. Phone #: ###-#### >> Inspection requested via web by PATRICK FLEMING need water heater pan and drain to exterior, cannot use water flex supply for pressure relief drain and cannot create a trap, may need to run new drain pipe to exterior for pressure relief drain. seal hole outside fto a/c unit. Furnace flue needs to be double wall or remove shelves.
|
MEC13-03991
| Final | 10/3/2013 | 10/4/2013 | 10/4/2013 9:55:26 AM | A | PASS |
|
|
Call John so someone can meet you at the job site ###-#### Phone #: ###-#### >> Inspection requested via web by John Bertram
|
MEC13-04066
| Rough-in | 10/3/2013 | 10/4/2013 | 10/4/2013 9:35:00 AM | A | PASS |
|
|
phone number is for the home owner Rose. This will need a rough and final as it is a gas insert addition. Thank you, Rick. Phone #: ###-#### >> Inspection requested via web by Mike Almanza
|
MEC13-04066
| Final | 10/4/2013 | 10/4/2013 | 10/4/2013 9:34:50 AM | P | PASS |
|
|
phone number is for the home owner Rose. This will need a rough and final as it is a gas insert addition. Thank you, Rick. Phone #: ###-#### >> Inspection requested via web by Mike Almanza
|
MEC13-03919
| Final | 10/1/2013 | 10/4/2013 | 10/4/2013 9:21:52 AM | A | FAIL |
|
|
Pls call customer prior to inspect Phone #: ###-#### >> Inspection requested via web by Echo Jackson c/n posted
|