Inspections for the day of: Tuesday, October 4, 2016.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-03225 Temporary Service10/4/201610/4/201610/4/2016 1:15:06 PMPPASS
Pole in back of lot Phone #: ###-#### Inspection requested via web by Robert Schroder
t/s o/h n ok
ELE16-02644 Electrical Rough-In10/4/201610/4/201610/4/2016 1:07:25 PMPNR
Wall Inspection Phone #: ###-#### Inspection requested via web by Ben Archibald
not ready will call back in when ready
ELE16-02600 Conference10/4/201610/4/201610/4/2016 12:02:18 PMPPASS
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen
EC has cans above shower stalls and was needing to know what kind of trim was needed
ELE16-02600 Permanent Service10/4/201610/4/201610/4/2016 12:02:12 PMPPASS
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen
p/s u/g n ok
ELE16-02600 Electrical Rough-In10/4/201610/4/201610/4/2016 12:01:38 PMPPASS
Dave is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen
3rd floor fireplace walls and headboard and bath walls and hard lids as noted on print ok
ELE16-01134 Conference10/3/201610/4/201610/4/2016 10:43:35 AMADONE
We are requesting a conferencetomorrow @ 9:00am on site with the us. Can you please contact Bobby @ ###-#### to verify that this meeting will work for you. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
Met with owners and Daryl for layout of all receptacles layout in all room layouts as per architectual drawings
ELE16-03154 Rough-In Permanent Service10/4/201610/4/201610/4/2016 10:40:48 AMPCANC
Rear patio new meter main, new riser, grounding. Phone #: ###-#### Inspection requested via web by David McClellan
justed needed p/s
ELE16-03154 Permanent Service10/4/201610/4/201610/4/2016 10:40:42 AMPPASS
Rear patio new meter main, new riser, grounding. Phone #: ###-#### Inspection requested via web by David McClellan
Contractor will insure grounds will be flush with concrete
p/s o/h rec ok
ELE16-03154 Rough-In Permanent Service10/3/201610/4/201610/4/2016 8:18:04 AMACANC
Re-energize service. Was unable to complete Monday.
Will refeed new circuits to old fuse panel afterwards. Fuse panel will become junction box with bond. Phone #: ###-#### Inspection requested via web by David McClellan
not ready