MEC16-04379
| Final | 10/3/2016 | 10/4/2016 | 10/4/2016 4:24:38 PM | P | PASS |
|
|
Late PM inspection please. Installer: Brandan ###-#### Thank you Phone #: ###-#### Inspection requested via web by Dustin Rich
|
PLM16-03508
| Water Heater Final | 9/27/2016 | 10/4/2016 | 10/4/2016 2:56:40 PM | P | PASS |
|
|
Home owner and contact is Ed Kerchentriner please call him prior to arrival at ###-####. Plumber was Peterson please call him should you have any questions at ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Maira Guzman
|
PLM16-03569
| Water Heater Final | 10/4/2016 | 10/4/2016 | 10/4/2016 2:15:49 PM | P | PASS |
|
|
Please call ahead Rod ###-#### Phone #: ###-#### Inspection requested via web by Chris Field
|
MEC16-04285
| Rough-in | 10/4/2016 | 10/4/2016 | 10/4/2016 1:55:15 PM | P | PART |
|
|
Oleg Phone #: ###-#### - middle 3 units okay, still need to fix the east 3 units
|
MEC16-03354
| Final | 10/4/2016 | 10/4/2016 | 10/4/2016 1:54:36 PM | P | FAIL |
|
|
Oleg Phone #: ###-#### - need uv protection on lines sets, missing return filters
|
PLM16-03554
| Water Heater Final | 9/29/2016 | 10/4/2016 | 10/4/2016 1:29:46 PM | P | FAIL |
|
|
CONTACT IS KATHY TANFIELD - PLEASE CALL WHEN EN ROUTE
tHANKS Phone #: ###-#### Inspection requested via web by JEREMY LINK - Need to pipe t&p drain
|
MEC16-03899
| Rough-in | 10/4/2016 | 10/4/2016 | 10/4/2016 12:10:58 PM | P | PASS |
|
|
Need a rough in inspection for Black Rock Coffee if you have any questions or concerns please contact Karl at ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin - okay to cover hard lids
|
MEC16-04396
| Final | 10/3/2016 | 10/4/2016 | 10/4/2016 11:05:21 AM | P | CANC |
|
|
Please call Lars to check project progress and confirm access. Phone #: ###-#### >> Inspection requested via web by Lars Fernandez Inspection cancelled from web by: Lars Fernandez
|
MEC15-04359
| Mec-Aging Inspection | 10/4/2016 | 10/4/2016 | 10/4/2016 11:00:19 AM | | DONE |
|
|
Expired
|
MEC15-04359
| DOC - Permit Expired | 10/4/2016 | 10/4/2016 | 10/4/2016 11:00:06 AM | A | PASS |
|
|
|
MEC16-01668
| Conference | 10/3/2016 | 10/4/2016 | 10/4/2016 10:48:16 AM | A | DONE |
|
|
Conf inspection request for podium at location. Please contact Rob Campbell ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - Meet on site with Rob. We discussed the installation of 4" dryer duct in the walls and I indicated the wall framing needs to be at least 4" wide. I also noticed that there may need to be fire/smoke dampers for the exhuast penetration into the rated shaft on the dwelling units. I am going to discuss the issue with the plan reviewers. Also going to discuss with them the use of sub duct design for domestic dryers.
|
MEC16-04135
| Rough-in | 10/3/2016 | 10/4/2016 | 10/4/2016 10:07:48 AM | A | PASS |
|
|
please call ernie with any questions Phone #: ###-#### Inspection requested via web by Nicholas Paige - okay to cover ceilings
|
MEC16-04223
| Rough-in | 10/3/2016 | 10/4/2016 | 10/4/2016 8:57:07 AM | A | FAIL |
|
|
call ahead for access; Phone #: 401- 5600 - This project is still under review
|
MEC16-03105
| Rough-in | 9/30/2016 | 10/4/2016 | 10/4/2016 8:56:15 AM | A | FAIL |
|
|
Contact-RJ-Please call 30 minutes ahead for our installer to meet you there. Thank you Phone #: ###-#### Inspection requested via web by Crystal - need installation instructions for fire dampers on site, fire dampers need to be installed per manufactures installation instructions.
|