Inspections for the day of: Friday, October 4, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Ady
TitleELE-INSPECTOR
Phone #914-4683
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03715 Electrical Rough-In10/3/201910/4/201910/4/2019 2:36:42 PMPPASS
wall rough-in Phone #: ###-#### Inspection requested via web by Kevin Perez Back offices, Bathroom and breakroom walls only ok to cover
ELE19-03760 Temporary Service10/4/201910/4/201910/4/2019 1:38:42 PMPPASS
Phone #: ###-#### Inspection requested via web by Greg Traudt t/s u/g n ok
ELE19-03761 Temporary Service10/4/201910/4/201910/4/2019 1:38:27 PMPFAIL
Phone #: ###-#### Inspection requested via web by Greg Traudt 210.4B Multi wire branch circuit shall be provided with mean to simultaniously disc. all ungrounded conductors(Missing handle tie on 50A GFCI breaker)
ELE19-03509 Electrical Rough-In10/3/201910/4/201910/4/2019 1:30:59 PMPPASS
Inspect underground to backfill. Matt Garcia ###-#### Phone #: ###-#### Inspection requested via web by Jeremy Cloud 1in to monument sign, 3in from mech room to service and L.V sleaves to elevator shaft ok to cover
ELE19-03699 Final10/4/201910/4/201910/4/2019 12:49:06 PMPPASS
Changing out meter base and riser only due to tree bending riser pipe. Phone #: ###-#### Inspection requested via web by David McClellan p/s o/h rec ok
ELE19-03379 Electrical Rough-In10/4/201910/4/201910/4/2019 12:35:08 PMPPASS
Floor heat inspection Phone #: ###-#### Inspection requested via web by Shaun Kirkman master floor heat only ok to cover
ELE19-02941 Temporary Service10/4/201910/4/201910/4/2019 12:03:13 PMAPASS
Phone #: ###-#### Inspection requested via web by Bob Glenn t/s u/g n ok
ELE19-02527 Electrical Rough-In10/3/201910/4/201910/4/2019 11:40:03 AMAPASS
This is an underground inspection. The electrician is Dan Lowry and he can be contacted at ###-####. Phone #: ###-#### Inspection requested via web by A.M.E. Office public works inspected before back fill
ELE19-03643 Final10/3/201910/4/201910/4/2019 10:50:17 AMAPASS
Please call Micah at ###-#### to ensure that we have someone meet you on site. Thanks! Phone #: ###-#### Inspection requested via web by Jesse Simpson final ok
ELE19-03215 Final10/3/201910/4/201910/4/2019 10:24:34 AMACANC
Please call 30 mins prior. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Called in wrong permit
ELE19-03563 Electrical Rough-In10/3/201910/4/201910/4/2019 10:21:48 AMAPASS
This is for a hot tub/pool in ground heating cable for concrete slab. If this can be early morning it would be appreciated. The electrician is Patrick Rohm his contact is ###-####. Phone #: ###-#### Inspection requested via web by A.M.E. Office 680.40. Section II of article 680 (680.27c3) does not apply to hot tubs. radiant heat ok to cover
ELE19-03765 Electrical Rough-In10/2/201910/4/201910/4/2019 9:00:45 AMAFAIL
Requesting Electrical Rough in Inspection.
Thanks Tim ###-#### Phone #: ###-#### Inspection requested via web by Tim Lawrence 330.12 MC cable shall not be exposed to physical damage. (MC shall not be strapped inside metal stud chanels) 330.17, 300.4D MC shall not be secured within 1 1/4in from the face of framing member. ( Multiple places in each area inspected. ) 362.12(8) ENT shall not be exposed to physical damage. (Installed in channel of metal studs.)
ELE17-02356 ELE-Aging Inspection10/4/201910/4/201910/4/2019 6:31:23 AM FAIL
Corrections not made final has not been scheduled
ELE17-02444 ELE-Aging Inspection10/4/201910/4/201910/4/2019 6:30:09 AM FAIL
Owner has not made attempt to final project.