BLD19-01828
| BLD-Concrete | 10/3/2019 | 10/4/2019 | 10/4/2019 3:53:35 PM | P | PART |
|
|
Slab on grade and thickened footing rebar inspection Phone #: ###-#### Inspection requested via web by Michael Zaccheo//vapor barrier ok//rebar ok pending specials//
|
BLD19-03624
| BLD-Foundation | 10/4/2019 | 10/4/2019 | 10/4/2019 3:29:41 PM | P | PASS |
|
|
Stacy Phone #: ###-####
|
BLD19-01055
| BLD-Wall Bracing | 10/4/2019 | 10/4/2019 | 10/4/2019 3:28:45 PM | P | PART |
|
|
shear // John Phone #: ###-####//shear nailing exterior ok//will need engineer to provide fix for missed hold downs at garage and front wall//interior shear walls were not complete at inspection//ok to wrap house when 2nd level straps and nails added as discussed//
|
BLD19-02476
| BLD-Foundation | 10/3/2019 | 10/4/2019 | 10/4/2019 2:25:28 PM | P | PART |
|
|
Corwin Phone #: ###-####//cut verts and lower horizontal bar for clearance at rear of garage//part of wall left out for truck access//ok to pour after bar is fixed//
|
BLD19-01370
| BLD-Framing/Rough-in | 10/4/2019 | 10/4/2019 | 10/4/2019 1:39:03 PM | P | FAIL |
|
|
//correction notice posted//
|
BLD19-01370
| BLD-Wall cover | 10/4/2019 | 10/4/2019 | 10/4/2019 1:10:31 PM | P | CANC |
|
|
Tim Phone #: ###-####//needs framing inspection//
|
BLD19-02383
| BLD-Energy code compliance | 10/3/2019 | 10/4/2019 | 10/4/2019 12:52:12 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD19-01311
| BLD-Final | 10/4/2019 | 10/4/2019 | 10/4/2019 12:35:01 PM | P | NR |
|
|
Bobby Phone #: ###-####//spoke with contact//will call in for monday inspection//
|
BLD19-02600
| BLD-Framing/Rough-in | 10/4/2019 | 10/4/2019 | 10/4/2019 11:39:18 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//framin corrections made// insulation ok//ok to cover//
|
BLD19-00534
| BLD-Concrete | 10/3/2019 | 10/4/2019 | 10/4/2019 11:38:32 AM | P | CANC |
|
|
Pouring slab on grade for this building early Monday morning so late inspection should work Phone #: ###-#### Inspection requested via web by Travis Blackburn//cancel per Matt//
|
BLD19-02972
| BLD-Wall Bracing | 10/3/2019 | 10/4/2019 | 10/4/2019 10:16:12 AM | A | FAIL |
|
|
Vedad Phone #: ###-####//correction notice posted//shear needs to be blocked per plan and nailing per engineering//
|
BLD19-01048
| BLD-Framing/Rough-in | 10/3/2019 | 10/4/2019 | 10/4/2019 9:25:40 AM | A | FAIL |
|
|
Backdoor will be unlocked. Pls cAll Eric ###-#### Phone #: ###-#### Inspection requested via web by Eric Mccray//corrections--to many to list//correction notice posted onsite//
|
BLD18-01822
| BLD-Aging Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 8:13:31 AM | | CANC |
|
|
|
BLD18-01816
| BLD-Aging Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 8:12:59 AM | | CANC |
|
|
|
BLD18-01834
| BLD-Aging Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 8:12:10 AM | | PASS |
|
|
Expires: 11/19/19
|
BLD18-01823
| BLD-Aging Inspection | 10/4/2019 | 10/4/2019 | 10/4/2019 8:11:08 AM | | CANC |
|
|
|
BLD17-02364
| BLD-Conference | 9/30/2019 | 10/4/2019 | 10/3/2019 8:13:24 AM | A | CANC |
|
|
Cesar Phone #: ###-####//check on blower door results///CO was issued//
|