BLD98-00891
| INSP-Final Inspection | 10/1/1998 | 10/5/1998 | 10/5/1998 12:00:00 AM | A | PART |
|
|
Scheduled by Hello!. temp occ approved for rooms 475-478
|
BLD98-01052
| INSP-Sprinkler Rough-in/Hydro | 10/5/1998 | 10/5/1998 | 10/5/1998 12:00:00 AM | A | PART |
|
|
early rough-in of shell, sway bracing not installed yet;
|
BLD98-01484
| INSP-Sprinkler Rough-in/Hydro | 10/5/1998 | 10/5/1998 | 10/5/1998 12:00:00 AM | A | PART |
|
|
sprinkler piping not installed in new spaces
|
BLD98-02742
| INSP-Final Inspection | 10/5/1998 | 10/5/1998 | 10/5/1998 12:00:00 AM | P | PASS |
|
|
don ###-#### occ approved
|
BLD98-01017
| INSP-Sprinkler Rough-in/Hydro | 10/5/1998 | 10/5/1998 | 10/5/1998 12:00:00 AM | P | PART |
|
|
sprinklers not needed under south canopy (awaiting letter from school about keeping combustibles from under canopy); sway bracing needed in basement; heads overspaced in basement bathroom
|