BLD00-02212
| BLD-Final | 10/4/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | A | FAIL |
|
|
fn advanced heat ###-#### mec permit requist on a bld # 10/5/2000 10:57:16 AM
|
BLD99-03148
| BLD-Framing/Rough-in | 10/4/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | A | FAIL |
|
|
Brett ###-#### corridor not ready/ pipe chase south of elavator / ele flex cable 10/5/2000 10:56:32 AM
|
MIS00-00232
| BLD-Final | 10/4/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | A | PASS |
|
|
FN -###-#### -DAVE
|
BLD00-01487
| BLD-Footing | 10/5/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | P | PASS |
|
|
###-#### interior fts ok 10/6/2000 9:08:08 AM
|
BLD00-01485
| BLD-Final | 10/5/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/05/2000 at 08:04:47. Contact: ###-####. need insulation facing . 10/5/2000 4:26:29 PM
|
BLD00-01488
| BLD-Framing/Rough-in | 10/5/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | P | NR |
|
|
###-####
|
BLD00-02511
| BLD-Framing/Rough-in | 10/5/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | P | PASS |
|
|
###-#### framing ok insulation ok plm to be accessable. 10/6/2000 8:55:31 AM
|
BLD00-01563
| BLD-Concrete | 10/4/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/04/2000 at 06:45:03. Contact: ###-####. placed with special insp. pending report. 10/5/2000 4:23:05 PM
|
BLD00-01374
| BLD-Framing/Rough-in | 10/4/2000 | 10/5/2000 | 10/5/2000 12:00:00 AM | P | PART |
|
|
RE-BAR INSP RON ###-#### placed with special insp pending report. 10/5/2000 4:03:12 PM
|