Inspections for the day of: Friday, October 5, 2001.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02423 BLD-Framing/Rough-in10/4/200110/5/200110/5/2001 12:00:00 AMAPART
###-#### need to complete framing. 10/5/2001 11:26:53 AM
BLD01-02187 BLD-Framing/Rough-in10/4/200110/5/200110/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/04/2001 at 12:26:15. Contact: ###-####. fire sprinkler room. 10/5/2001 11:43:16 AM
BLD01-02362 BLD-Framing/Rough-in10/4/200110/5/200110/5/2001 12:00:00 AMAFAIL
###-####. need truss details. 10/5/2001 10:10:51 AM
BLD01-01956 BLD-Footing10/4/200110/5/200110/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/04/2001 at 17:02:49. Contact: .footing. 10/5/2001 11:26:12 AM
BLD01-01288 BLD-Final10/5/200110/5/200110/5/2001 12:00:00 AMPNH
###-####
BLD01-01466 BLD-Final10/5/200110/5/200110/5/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/05/2001 at 08:22:31. Contact: ###-####.
BLD01-01961 BLD-Framing/Rough-in10/5/200110/5/200110/5/2001 12:00:00 AMPPART
late pm ###-####. ok to sheetrock. 10/5/2001 4:24:29 PMneed a truss detail for rear new addition. small sizor truss. does not appear to req any bracing. contractor noitfied by c/n. Note a post is now in possition in the garage if post is removed from under beam calculations will need to be provided for the 5-1/8 x14 bci beam. also on c/n.10/5/2001 4:27:56 PM 10/5/2001 4:34:10 PM