Inspections for the day of: Friday, October 5, 2001.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01966 MEC-Aging Inspection10/5/200110/5/200110/5/2001 12:00:00 AM PASS
MEC01-01937 MEC-Aging Inspection10/5/200110/5/200110/5/2001 12:00:00 AM PASS
MEC01-02566 Final10/5/200110/5/200110/5/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/05/2001 at 07:19:28. Contact: ###-####. will sign perm occ...after gas test ok'd 10/5/2001 9:02:48 AM
MEC01-02258 Final10/4/200110/5/200110/5/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/04/2001 at 14:18:23. Contact: ###-####. frame b-vent 2nd floor..complete ducts..kit exhaust n/r...complete f/p trim..need protection post at furn
10/5/2001 9:44:00 AM
MEC01-02986 Rough-in10/4/200110/5/200110/5/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/04/2001 at 15:42:19. Contact: ###-####.
MEC01-02986 Pressure Test10/4/200110/5/200110/5/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/04/2001 at 15:42:45. Contact: ###-####. no address posted 10/5/2001 10:55:54 AM
MEC01-02909 Pressure Test10/4/200110/5/200110/5/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/04/2001 at 17:27:36. Contact: ###-####.
MEC01-02151 Final10/5/200110/5/200110/5/2001 12:00:00 AMPCANC
###-#### dave
MEC01-02989 Rough-in10/5/200110/5/200110/5/2001 12:00:00 AMPFAIL
Joe ###-#### NEED SPECS ON MANTLE CLEARANCE 10/5/2001 4:08:04 PM
MEC01-02509 Final10/5/200110/5/200110/5/2001 12:00:00 AMPNR
###-#### sam address is on a sign in frount of the cone. NEED KIT EXHAUST COMPLETED 10/5/2001 4:07:49 PM
MEC01-02957 Final10/5/200110/5/200110/5/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/05/2001 at 10:04:31. Contact: ###-####.