BLD01-00070
| BLD-Aging Inspection | 10/5/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | | PART |
|
|
wip 10/5/2001 8:31:09 AM
|
BLD01-00068
| BLD-Conference | 10/5/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | A | DONE |
|
|
Scheduled by Inspector: 420 On 10/5/2001 9:19:46 AM Discussion with contractor in regards to the 1-Hr. seperation between H-4 and B. 10/5/2001 9:21:07 AM
|
BLD01-02262
| BLD-Framing/Rough-in | 10/3/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | A | PASS |
|
|
bob- ###-#### shear nail SHEAR--OK TO SIDE--corrections completed while on site. 10/5/2001 9:54:06 AM
|
BLD01-01975
| BLD-Wall cover | 10/4/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/04/2001 at 11:51:49. Contact: . ok to cover--energy report needed prior to issuance of the c. of c. at the final. 10/5/2001 12:26:37 PM
|
BLD01-02330
| BLD-Framing/Rough-in | 10/4/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | A | PASS |
|
|
###-#### SHEAR-OK TO SIDE 10/5/2001 9:29:46 AM
|
BLD01-02076
| BLD-Energy code compliance | 10/4/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | P | PART |
|
|
jason ###-#### c/n--ok to insulate--Not Energy this inspection was a framing. 10/5/2001 3:01:56 PM
|
MEC01-02990
| Rough-in | 10/5/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | P | PASS |
|
|
brandon =###-#### r/i
|
BLD01-01578
| BLD-Framing/Rough-in | 10/5/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | P | PART |
|
|
###-#### c/n -- ok to insulate 10/5/2001 2:01:01 PM
|
BLD01-02196
| BLD-Footing | 10/5/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/05/2001 at 10:06:20. Contact: ###-####. wip 10/5/2001 1:04:44 PM
|
BLD01-02197
| BLD-Footing | 10/5/2001 | 10/5/2001 | 10/5/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/05/2001 at 10:07:37. Contact: ###-####. Canceled by contractor 10/5/2001 1:00:35 PM
|