Inspections for the day of: Tuesday, October 5, 2004.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01644 BLD-Foundation10/4/200410/5/200410/5/2004 12:00:00 AMACANC
dave==shear wall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD04-02221 BLD-Footing10/4/200410/5/200410/5/2004 12:00:00 AMAPASS
###-#### bob
footings for point load at posts in garage for new addition second level. 10/5/2004 10:17:01 AM
BLD03-01219 BLD-Final10/4/200410/5/200410/5/2004 12:00:00 AMAPASS
###-#### - colyn
/4/2004 2:24:42 PM 10/4/2004 2:25:53 PM
MEC04-02657 Final10/1/200410/5/200410/5/2004 12:00:00 AMAPASS
brenda ###-####
MEC04-02657 Pressure Test10/1/200410/5/200410/5/2004 12:00:00 AMAPASS
brenda ###-####
BLD03-01644 BLD-Other10/5/200410/5/200410/5/2004 12:00:00 AMAPASS
shear on walls and roof ok, engineer stamped letter stating H clips not needed at roof sheathing. 10/5/2004 9:50:11 AM
BLD04-01713 BLD-Foundation10/5/200410/5/200410/5/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/5/2004 at 10:58:56 AM. Contact: ###-####.
BLD04-01178 BLD-Footing10/4/200410/5/200410/5/2004 12:00:00 AMPFAIL
jed; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Need approval by Terry Records 10/5/2004 4:21:18 PM
BLD04-02150 BLD-Foundation10/4/200410/5/200410/5/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/4/2004 at 5:17:15 PM. Contact: ###-####.
BLD04-02148 BLD-Footing10/4/200410/5/200410/5/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/4/2004 at 5:18:44 PM. Contact: ###-####. wip 10/5/2004 1:55:33 PM
BLD04-01312 BLD-Final10/5/200410/5/200410/5/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/5/2004 at 9:02:13 AM. Contact: ###-####. Need electrical final. 10/5/2004 2:38:21 PM