Inspections for the day of: Friday, October 5, 2007.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-00986 BLD-Concrete10/4/200710/5/200710/8/2007 9:22:30 AMPPART
howard rebar - 2nd floor Phone #: ###-#### need engineering for floor change. si on site
BLD07-00018 BLD-Final10/5/200710/5/200710/5/2007 3:05:15 PMPCANC
kent - around 4:00 if possib le Phone #: ###-#### no insp.
BLD07-00441 BLD-Framing/Rough-in10/5/200710/5/200710/5/2007 2:56:44 PMPPART
jeff Note: cover Phone #: ###-#### c/n top chord cut under tub/ air seal needs installed.
BLD07-02524 BLD-Foundation10/5/200710/5/200710/5/2007 2:27:23 PMPPASS
justin Phone #: ###-####
BLD07-02572 BLD-Framing/Rough-in10/5/200710/5/200710/5/2007 2:04:17 PMPNR
steve Phone #: ###-####
MIS07-00109 DOC - Permit Finaled10/5/200710/5/200710/5/2007 1:48:19 PMPPASS
BLD07-02504 BLD-Footing10/4/200710/5/200710/5/2007 1:46:34 PMPPASS
eric Phone #: ###-#### mono pour ft and wall.
BLD07-02536 BLD-Footing10/5/200710/5/200710/5/2007 1:37:35 PMPPASS
donnie Phone #: ###-####
BLD07-00812 BLD-Framing/Rough-in10/4/200710/5/200710/5/2007 11:19:35 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Tracey Greenlee engineer to field review brace pannel as built for design compliance to engineering and aplaction of componets.
BLD07-02256 BLD-Framing/Rough-in10/4/200710/5/200710/5/2007 10:19:25 AMAPASS
jeff Phone #: ###-####
BLD07-01013 BLD-Framing/Rough-in10/4/200710/5/200710/5/2007 9:58:25 AMAPASS
MARC Phone #: ###-####
BLD07-01888 BLD-Energy code compliance10/4/200710/5/200710/5/2007 9:34:46 AMAPASS
Scheduled by a contractor via Hello! on 10/4/2007 at 11:39:02 AM. Contact: ###-####.
BLD05-01278 BLD-Final10/2/200710/5/200710/4/2007 9:29:56 AMAPASS
gene Phone #: ###-####
BLD04-02243 BLD-Final10/2/200710/5/200710/4/2007 9:29:29 AMAPASS
gene Phone #: ###-####